My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-05_GENERAL DOCUMENTS - M1992076
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1992076
>
2017-04-05_GENERAL DOCUMENTS - M1992076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 2:52:55 PM
Creation date
2/17/2022 10:02:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992076
IBM Index Class Name
General Documents
Doc Date
4/5/2017
Doc Name Note
Hard Scrabble/ S Bar C bond Forfeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> DATE: April 6, 2017 <br /> TO: All Bidders for the Hard Scrabble/S Bar C Bond Forfeiture Project <br /> FROM: Erica Crosby, Division of Reclamation, Mining & Safety <br /> RE: Hard Scrabble/S Bar C Bond Forfeiture Project - PKA-17-779 <br /> Amendment No. 1 <br /> Thank you for your interest in the Hard Scrabble/S Bar C Bond Forfeiture Project and attending <br /> the Pre-Bid Meeting on April 5, 2017. Any questions related to the project shall be submitted <br /> by Tuesday, April 11, 2017. The following clarifications and amendments should be noted and <br /> incorporated into the bid document: <br /> 1. Time of Completion: The time of completion allowed for the project is increased <br /> ten (10) calendar days, for a total of fifty (50) calendar days to complete the project. <br /> 2. Bid Item 3.0: The Hard Scrabble overburden pile shall be removed to a depth of <br /> three feet (3-ft) above the pond level, with side slopes graded to 3H:iV or less. This will <br /> reduce the volume of the pile to move to 22,500 CY. Please not this item in the new Bid <br /> Schedule. All other specifications remain the same. <br /> 3. Bid Item 4.0: Attached is the map of the S Bar C Pit that was inadvertently left <br /> out of the bid document. All other specifications remain the same. <br /> 4. Bid Item 12.0- Additional Equipment Time for D8 Dozer (New) Bid Item 12.0 <br /> has been added to include additional equipment time for a D8 Dozer (or equivalent size) with <br /> operator. Dozer time will be used as directed by the PROJECT MANAGER in accordance with <br /> Standard Work Specifications, Section 19.0 of the General Bid Specification, 2009. Please note <br /> this item in the new Bid Schedule. <br /> 5. Sediment Controls: Sediment controls are not warranted during construction due <br /> to the location of the work inside the gravel pits that drain internally. <br /> All terms and conditions of the Invitation and Bid other than as changed by this amendment <br /> remain the same. Receipt and acceptance of this amendment shall be acknowledged on the bid <br /> form and by submitting the revised Bid Schedule. Please be reminded that the deadline for all <br /> bids to be submitted is no later than 4:00 a.m. on Wednesday, April 19, 2017. <br /> 'Co <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us 1,976 x <br /> John W. Hickenlooper, Governor I Robert Randall, Executive Director I Virginia Brannon, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.