All operations under this section will be under the direct supervision of the PROJECT <br /> MANAGER and work under this section shall be performed only as ordered and directed <br /> by the PROJECT MANAGER. The PROJECT MANAGER will designate the work to be <br /> performed and the order in which it is to be done, and WILL inspect all work. The PROJECT <br /> MANAGER will maintain documentation of the work. <br /> "Operation" means that time spent in performing work as well as time necessary for moving <br /> equipment around the work site when directed by the PROJECT MANAGER. However, <br /> "operation" does not include that time spent in transporting the equipment to the initial <br /> work site, removing the equipment when all work has been completed, transporting the <br /> equipment away from and returning it to the work site in the event of a temporary or <br /> seasonal suspension of operation, maintenance of the equipment, any time during which <br /> the equipment is "bogged down" or otherwise not working, nor for any periods when <br /> operations are suspended by the PROJECT MANAGER. <br /> Measurement and Payment <br /> The number of hours each piece and type of equipment used as directed by the PROJECT <br /> MANAGER under this specification will be counted to the nearest one-half hour (1/2 hr.). <br /> Payment will be made at the unit price established in ITEM 8.0 of the Bid Schedule. Such <br /> payment shall include the cost of all materials, accessories, labor, maintenance, <br /> operating supplies, salaries of operators, and any other expenses incidental to the <br /> operation of the equipment in the performance of work in accordance with this <br /> specification and bid item(s). No extra payment will be made for the use of the same <br /> equipment while performing work on other bid items on the Invitation and Bid Sheet or Bid <br /> Schedules. No additional payment will be made for hauling equipment to or away from <br /> the work site except as may be proper under Mobilization/Demobilization. <br /> ITEM 9.0 ADDITIONAL ONSITE BACKFILL AT HARD SCRABBLE PIT <br /> Generate and install an additional five thousand cubic yards (5,000 yd3) of backfill and <br /> grade as specified in ITEM 3.0 of this document <br /> Measurement and Payment <br /> Measurement for payment shall be made of the actual unit quantities provided and <br /> installed according to specification, at the unit cost indicated on the Bid Schedule. THIS <br /> ITEM IS NOT GUARANTEED. <br /> ITEM 10.0 ADDITIONAL ONSITE BACKFILL AT S BAR C PIT <br /> Generate and install an additional five thousand cubic yards (5,000 yd3) of backfill and <br /> grade as specified in ITEM 4.0 of this document <br /> Measurement and Payment <br /> Measurement for payment shall be made of the actual unit quantities provided and <br /> installed according to specification, at the unit cost indicated on the Bid Schedule. THIS <br /> ITEM IS NOT GUARANTEED. <br /> Page 13 of 14 <br />