My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-08_GENERAL DOCUMENTS - M1987090 (2)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1987090
>
2019-05-08_GENERAL DOCUMENTS - M1987090 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 2:52:05 PM
Creation date
2/17/2022 9:46:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987090
IBM Index Class Name
General Documents
Doc Date
5/8/2019
Doc Name Note
Paulene Pit Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAFETY, HEALTH, & ENVIRONMENTAL ACTION PLAN <br /> The following is a summary list of items pertaining to the Paulene Pit Project. Each employee <br /> of Berry Trucking & Excavating is to read and sign the plan as part of the project orientation <br /> prior to starting work. <br /> A. SITE ACESS <br /> - No person may enter the job site without first receiving hazard training from Berry <br /> Trucking & Excavating. <br /> - Contractor employees are required to travel to and from their work areas by <br /> designated routes. <br /> All contractor equipment is subject to a safety inspection before entering the job <br /> site <br /> B. PART 48 TRAINING REQUIRMENTS <br /> - Each contractor employee shall receive orientation training, provided by the <br /> contractor, comprised of all aspects of the contracts Safety, Health, and <br /> Environmental Action Plan (SHEAP) <br /> C. SUBSTANCE ABUSE SCREENING <br /> - Alcohol and drugs are not allowed on the job site <br /> D. PROACTIVE SAFETY <br /> - The contractor shall designate one person to be responsible for safety and health at <br /> the work site. <br /> - The contractor shall have safety meetings at least weekly <br /> - All safety meetings shall be documented and include the date, subject matter, <br /> trainer and all participants signatures <br /> - Daily pre-job safety talks shall be given by the contractor <br /> - Any change in the daily work plan shall be communicated by the contractor to all <br /> affected personnel <br /> - The contractor shall conduct daily work area inspections <br /> - These inspections shall be documented in an approved book <br /> E. GENERAL SAFETY STANDARDS <br /> -Horseplay will not be tolerated <br />
The URL can be used to link to this page
Your browser does not support the video tag.