Laserfiche WebLink
C) <br /> RPM,Inc.,25049 E.alder Dr.,Aurora,CO 80016 Phone:(303)854-7499 Email:h1humphries2ldcomcast.net <br /> Custom Soil Resource Report <br /> United States Deparvnent of Agriculture.Natural Resources Conservation Service. <br /> National soil survey handbook.title 430-Vi.http:ilwww.nres.usda.gov/wps/portall <br /> nms/det3dlsoilsisc�ntists/?cid=nres142p2_D54242 <br /> United States Department of Agriculture.Natural Resources Conservation Service. <br /> 2000.land resource regions and major land resource areas of the United States. <br /> the Caribbean.and the Pacific Basin.U.S.Department of Agriculture Handbook <br /> 290. http:llwww.nres.usda.gov/wps/ponaVnres/detaillnationalisoiis/? <br /> cid=nres142p2_D53824 <br /> United States DeparVne t of Agriculture,Soil Conservation Serviow 196 1 Land <br /> capability classification. U.S.D.epartrnent of Agriculture Handbook 210 httpJ/ <br /> wow_n res_usda.gov/InterneV FSE_DOCUM E NTSlnres 142p2_052290.pdf <br /> (b) Identify any permanent man-made structures within two hundred feet of <br /> the affected land and owner(s) of each structure. Locate structure each <br /> on Exhibit "E" map: (A narrative description must be provided) <br /> Please see the map labeled"Location Map and Structures Within 200 Feet". <br /> Fence lines owned by Mile 250 LLC <br /> Oil and gas facility and associated structures owned by Civitas Resources <br /> LLC. <br /> (c) A description of the water resources in the area of the proposed <br /> operation. Identify any streams,springs, lakes, stock water ponds, ditches, <br /> reservoirs, and aquifers that would receive drainage directly from the <br /> affected area. Provide any information available from publications or <br /> monitoring data on flow rates,water table elevations and water quality <br /> conditions; and <br /> The water resources SEMA is aware of is the ground water alluvial aquifer which <br /> lies beneath the proposed mining operation. <br /> In addition,the Little Thompson River lies to the north of the proposed operation. <br /> Runoff from the operation is managed by our Stormwater Management Plan. <br /> This is an expansion of the existing 111 mining operation. Therefore, we <br /> anticipate not to change in how storm water runoff is managed. Most runoff will <br /> be contained within the excavated pit area. <br /> 44 <br />