Laserfiche WebLink
Other Reclamation Permits held by Prospective Successor(if applicable): <br /> Mao L IQ -00 rA 141'1ci 103 , fn 11-IgL# CLI -011 Yh.I494-�c��� <br /> gr <br /> fnr► K�i,1'"1 -1 Yl is 1 1 1'1+ ao k_ -yk 1.M M-4no:3-S0-1 19" -O 0s- <br /> 1 I d? X7 n079 <br /> I 90- 11 y rn an Is—D PYl abzI-On ly. W ao jA -b a-5 <br /> DESIGNATION OF REVIEW TIMELINE <br /> As explained above, the Permittee and Prospective Successor may waive their right to receive a <br /> decision on an Application within 30 days in order to allow the Division to calculate the required <br /> Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br /> one of the following two options to designate their choice. If Permittee and Prospective <br /> Successor cannot agree, the Division will render its decision within 30 days. <br /> (2 I have reviewed the information provided in this Application <br /> Pe tt Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br /> Pros ective Su sso MY APPLICATION WITHIN 30 DAYS. <br /> I have reviewed the information provided in this Application <br /> Permittee Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br /> Prospective Successor ON MY APPLICATION WITHIN 30 DAYS. <br /> The Prospective Successor must provide an adequate Financial Warranty or conditional <br /> replacement Financial Warranty, consistent with the designation above. Hard Rock and <br /> Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br /> Each Financial Warranty must be submitted on the Board's approved forms (available online at <br /> http://mining.state.co.us/Mineral%20Forms.htm). <br /> -6 - <br />