My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-09_PERMIT FILE - M2021046 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021046
>
2022-02-09_PERMIT FILE - M2021046 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:07 PM
Creation date
2/9/2022 2:57:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021046
IBM Index Class Name
Permit File
Doc Date
2/9/2022
Doc Name Note
Appendix E AMEC 2016 Sub App F CQA
Doc Name
Adequacy Review Response
From
Zephyr Gold USA Ltd
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br /> foster <br /> wheeler <br /> Zephyr Gold USA Ltd. PAGE 3 OF 8 <br /> Dawson Gold Project SEC. NO.: <br /> Dawson Filtered Tailings Storage Facility SPECIFICATION 02777.0 <br /> Pre-feasibility Study <br /> TECHNICAL SPECIFICATIONS FOR DATE: (ORIGINAL) <br /> Fremont County, Colorado GEOTEXTILE 20-October-16 <br /> PROJECT NO.: 74201633 REVISION: A <br /> DATE: 20-Oct-16 <br /> 1.0 GENERAL <br /> 1.1 SUMMARY <br /> This SPECIFICATION was prepared for the Pre-feasibility Study for the Dawson Filtered Tailings Storage <br /> Facility(FTSF). This SPECIFICATION describes requirements forthe manufacture,fabrication (if needed), <br /> supply, and installation of geotextile for the Dawson Filtered Tailings Storage Facility(FTSF) as developed <br /> for the Pre-feasibility level design. These SPECIFICATIONS are not intended for construction or bidding <br /> purposes. <br /> 1.2 SUBMITTALS <br /> The following items shall be submitted to the ENGINEER for review and release prior to purchasing any <br /> materials for the Work. The ENGINEER'S review will be made to verify that the general scope of Work is <br /> adequate and that the CONTRACTOR is qualified to perform the Work. Review and release of submittals <br /> does not relieve CONTRACTOR of any of the responsibilities and requirements of this Section and the <br /> DRAWINGS. <br /> CONTRACTOR shall provide the following information relating to the geotextile MANUFACTURER with its <br /> proposal: <br /> • MANUFACTURER'S technical SPECIFICATIONS and product data for all materials and products <br /> furnished, installed or used in the performance of the Work under this Section. <br /> MANUFACTURER'S technical SPECIFICATIONS shall include product name, lot number or <br /> identification, product properties and recommended conditions of use. <br /> • A copy of the MANUFACTURER'S geotextile quality control (QC)test results of properties outlined <br /> in Article 3.0 of this Section. The ENGINEER reserves the right to refuse use of any geotextile <br /> supplied without the proper QC documentation. <br /> 1.3 QUALITY ASSURANCE <br /> All Work shall be constructed, monitored, and tested in compliance with requirements in the CQA Plan <br /> (Section 01400.2). CONTRACTOR and MANUFACTURER shall participate and comply with all items in <br /> these SPECIFICATIONS and requirements of the CQA Plan. <br /> CONTRACTOR shall ensure that geotextile MANUFACTURER has an internal product quality control <br /> program that meets Contract requirements. <br /> S:\ZEPHYR MINERALS\DRMS MINE APPLICATION\02777-GEOTEXTILE.DOCX <br />
The URL can be used to link to this page
Your browser does not support the video tag.