Laserfiche WebLink
amec <br /> foster <br /> wheeler <br /> Zephyr Gold USA Ltd. PAGE 10 OF 11 <br /> Dawson Gold Project <br /> Dawson Filtered Tailings Storage Facility SPECIFICATION SEC. NO.: <br /> 01400.1 <br /> Pre-feasibility Study TECHNICAL SPECIFICATIONS FOR EARTHWORKS DATE: (ORIGINAL) <br /> Fremont County, Colorado CONSTRUCTION QUALITY ASSURANCE(CQA) 20-October-16 <br /> PROJECT NO.: 74201633 PLAN REVISION: A <br /> DATE: 20-Oct-16 <br /> • Work planned for next period. <br /> • Signature of the CQA MONITOR. <br /> 7.7 CONSTRUCTION COMPLETION REPORT <br /> At the completion of the project, the CQA MONITOR shall submit to the MANAGER and OWNER a <br /> Construction Completion Report. This report shall indicate that the Work has been performed in compliance <br /> with the DRAWINGS and SPECIFICATIONS and will contain the following information: <br /> • Summary of all construction activities. <br /> • Photographic documentation. <br /> • Test data sheets. <br /> • Copies of monthly reports. <br /> • CQA test results, including date, test locations and resolutions of deficient test results. <br /> • Staff schedule summary. <br /> • A description of significant construction problems and the resolution of these problems. <br /> • Changes to the DRAWINGS or SPECIFICATIONS and the justification for these changes. <br /> • Record DRAWINGS. <br /> • A statement that construction was completed in compliance with the DRAWINGS and <br /> SPECIFICATIONS, signed by the ENGINEER. <br /> S:\ZEPHYR MINERALS\DRMS MINE APPLICATION\01400.1-EARTHWORKS CQA.DOCX <br />