Laserfiche WebLink
amec <br /> foster <br /> wheeler <br /> Zephyr Gold USA Ltd. PAGE 7 OF 11 <br /> Dawson Gold Project <br /> Dawson Filtered Tailings Storage Facility SPECIFICATION SEC. NO.: <br /> 01400.1 <br /> Pre-feasibility Study TECHNICAL SPECIFICATIONS FOR EARTHWORKS DATE: (ORIGINAL) <br /> Fremont County, Colorado CONSTRUCTION QUALITY ASSURANCE(CQA) 20-October-16 <br /> PROJECT NO.: 74201633 PLAN REVISION: A <br /> DATE: 20-Oct-16 <br /> constructed and existing structures. The CQA MONITOR(S)will record visual observations throughout the <br /> construction process to ensure that the materials are placed to the minimum dimensions as shown on the <br /> DRAWINGS. <br /> 6.1 FOUNDATION PREPARATION <br /> The CQA MONITOR(S)shall observe and document the foundation preparation including: <br /> • Initial Foundation Cleaning: Stripping and excavation activities required to remove any unsuitable <br /> materials such as loose or embedded rock, soft soils or tailings, organic material, and any other <br /> deleterious material (such as debris, roots, branches, vegetation, or mud). The CQA MONITOR <br /> will document that any unsuitable materials, as determined by the ENGINEER, are removed and <br /> placed in an appropriate stockpile facility. <br /> • Stockpiling activities to include verification of location of stockpile, material type, and dressing. <br /> • Excavations for seeps, unsuitable foundation soil, elevation, and proper drainage. <br /> • Foundation subgrade preparation to confirm that the surface of the subgrade is free of soft, organic, <br /> and otherwise deleterious materials, and that soil and rock surfaces that contain joints or fractures <br /> are adequately filled in accordance with the SPECIFICATIONS. <br /> • Construction of access roads, site grading, drainage control features and erosion control features <br /> to verify compliance with the DRAWINGS and SPECIFICATIONS. <br /> 6.2 PLACEMENT OF MATERIALS <br /> During placement of any engineered fill such as Rockfill, Structural Fill, Geomembrane Cushion Material, <br /> Filter Material, Drain Gravel, and Riprap, the CQA MONITOR(S)shall: <br /> • Verify the use of appropriate fills. <br /> • Monitor and document that the material placement, including soil type, particle size, loose lift <br /> thickness, moisture conditioning process, compaction equipment, methods used to attain <br /> compaction, including number of passes, uniformity of compaction coverage, compacted lift <br /> thickness, bonding of lifts, in-place moisture content and dry density is in compliance with the <br /> SPECIFICATIONS. <br /> • Monitor surface preparation to verify that the soil surface is suitable for geomembrane installation <br /> as discussed in the SPECIFICATIONS. <br /> • Monitor the soil placement to confirm that they comply with the SPECIFICATIONS. <br /> S:\ZEPHYR MINERALS\DRMS MINE APPLICATION\01400.1-EARTHWORKS CQA.DOCX <br />