My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-09_PERMIT FILE - M2021046 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021046
>
2022-02-09_PERMIT FILE - M2021046 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:07 PM
Creation date
2/9/2022 2:57:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021046
IBM Index Class Name
Permit File
Doc Date
2/9/2022
Doc Name Note
Appendix E AMEC 2016 Sub App F CQA
Doc Name
Adequacy Review Response
From
Zephyr Gold USA Ltd
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br /> foster <br /> wheeler <br /> Zephyr Gold USA Ltd. PAGE 4 OF 11 <br /> Dawson Gold Project <br /> Dawson Filtered Tailings Storage Facility SPECIFICATION SEC. NO.: <br /> 01400.1 <br /> Pre-feasibility Study TECHNICAL SPECIFICATIONS FOR EARTHWORKS DATE: (ORIGINAL) <br /> Fremont County, Colorado CONSTRUCTION QUALITY ASSURANCE(CQA) 20-October-16 <br /> PROJECT NO.: 74201633 PLAN REVISION: A <br /> DATE: 20-Oct-16 <br /> • Review and approval of DRAWINGS and SPECIFICATIONS for all soil components of the Dawson <br /> FTSF construction and related facilities as required. <br /> • Preconstruction coordination with the ENGINEER and CQA MONITOR to ensure that the CQA <br /> Plan can be implemented. <br /> • Coordination of all construction activities associated with required CQA testing and activities. <br /> • Scheduling and coordinating construction activities with the ENGINEER and CQA MONITORS for <br /> required CQA testing and activities. <br /> • Approve with the CQA MONITOR specific corrective measures to be implemented during <br /> construction when deviations from these SPECIFICATIONS occur. <br /> • MANAGER shall serve as communications coordinator for the project, initiating preconstruction <br /> and resolution meetings. As communications coordinator, MANAGER will serve as a liaison <br /> between all parties involved in the project to ensure that ongoing communications are maintained. <br /> CONTRACTOR:The Earthworks CONTRACTOR, also referred to as "CONTRACTOR", is responsible for <br /> proper processing, delivery, and placement of all components of the Dawson FTSF as shown on the <br /> DRAWINGS and as outlined in the SPECIFICATIONS. <br /> ENGINEER: The ENGINEER is responsible for the design and preparation of the DRAWINGS and <br /> SPECIFICATIONS, and for confirming that the construction was performed in compliance with the <br /> DRAWINGS and SPECIFICATIONS. The ENGINEER is also responsible for approving all design and <br /> SPECIFICATION changes, modifications, or clarifications encountered during construction. MANAGER <br /> and ENGINEER shall be responsible for the resolution of all quality assurance issues. <br /> Additional duties for this position include the following: <br /> • Preconstruction coordination with the CQA MONITOR(S) to ensure that the CQA MONITOR(S) <br /> has performed reviews of the DRAWINGS and SPECIFICATIONS and that the CQA Plan can be <br /> implemented. <br /> • Overseeing the construction QC operations performed by CONTRACTOR. <br /> • Approve specific corrective measures to be implemented during construction when deviations from <br /> the SPECIFICATIONS occur. <br /> • Ensure that required quality assurance testing has been performed in accordance with the CQA <br /> Plan. <br /> S:\ZEPHYR MINERALS\DRMS MINE APPLICATION\01400.1-EARTHWORKS CQA.DOCX <br />
The URL can be used to link to this page
Your browser does not support the video tag.