My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-09_PERMIT FILE - M2021046 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021046
>
2022-02-09_PERMIT FILE - M2021046 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:07 PM
Creation date
2/9/2022 2:57:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021046
IBM Index Class Name
Permit File
Doc Date
2/9/2022
Doc Name Note
Appendix E AMEC 2016 Sub App F CQA
Doc Name
Adequacy Review Response
From
Zephyr Gold USA Ltd
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br /> foster <br /> wheeler <br /> Zephyr Gold USA Ltd. PAGE 4 OF 17 <br /> Dawson Gold Project SEC. NO.: <br /> Dawson Filtered Tailings Storage Facility SPECIFICATION 02776.0 <br /> Pre-feasibility Study <br /> TECHNICAL SPECIFICATIONS FOR DATE: (ORIGINAL) <br /> Fremont County, Colorado GEOMEMBRANE 20-October-16 <br /> PROJECT NO.: 74201633 REVISION: A <br /> DATE: 20-Oct-16 <br /> 1.0 GENERAL <br /> 1.1 SUMMARY <br /> This SPECIFICATION was prepared for the Pre-feasibility Study for the Dawson Filtered Tailings Storage <br /> Facility(FTSF). This SPECIFICATION describes requirements forthe manufacture,fabrication (if needed), <br /> supply, and installation of polyethylene geomembrane for lining the contact water pond associated with the <br /> Dawson Filtered Tailings Storage Facility (FTSF) as developed for the Pre-feasibility level design. These <br /> SPECIFICATIONS are not intended for construction or bidding purposes. <br /> 1.2 CONSTRUCTION QUALITY ASSURANCE <br /> All Work shall be constructed, monitored, and tested in compliance with the requirements of the CQA Plan <br /> (Section 01400.2). CONTRACTOR and MANUFACTURER shall participate in and comply with all items <br /> in these SPECIFICATIONS and requirements of the CQA Plan. Quality Control testing shall be the <br /> responsibility of the INSTALLER. <br /> 1.2.1 FIELD SAMPLES <br /> Geomembrane sampling and testing shall be conducted in accordance with the project SPECIFICATIONS <br /> for the following: <br /> • Trial seam testing <br /> • Destructive seam testing <br /> CONTRACTOR shall maintain on-site a minimum of one spare operable tensiometer and provide <br /> documentation indicating that all tensiometers used at the project were calibrated within sixty (60) days <br /> prior to the tensiometer arriving on-site for testing field samples. <br /> 1.3 DELIVERY, STORAGE, AND HANDLING <br /> 1.3.1 PACKING AND SHIPPING <br /> Labels on each roll delivered to Site shall identify the following: <br /> • MANUFACTURER'S name; <br /> • Product Identification; <br /> • Thickness; <br /> S:\ZEPHYR MINERALS\DRMS MINE APPLICATION\02776-GEOMEMBRANE.DOCX <br />
The URL can be used to link to this page
Your browser does not support the video tag.