My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-09_PERMIT FILE - M2021046 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021046
>
2022-02-09_PERMIT FILE - M2021046 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:07 PM
Creation date
2/9/2022 2:57:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021046
IBM Index Class Name
Permit File
Doc Date
2/9/2022
Doc Name Note
Appendix E AMEC 2016 Sub App F CQA
Doc Name
Adequacy Review Response
From
Zephyr Gold USA Ltd
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br /> foster <br /> wheeler <br /> Zephyr Gold USA Ltd. PAGE 12 OF 13 <br /> Dawson Gold Project <br /> Dawson Filtered Tailings Storage Facility SPECIFICATION SEC. NO.: <br /> 01400.2 <br /> Pre-feasibility Study TECHNICAL SPECIFICATIONS FOR DATE: (ORIGINAL) <br /> Fremont County, Colorado GEOSYNTHETICS CONSTRUCTION QUALITY 20-October-16 <br /> PROJECT NO.: 74201633 ASSURANCE(CQA) PLAN REVISION: A <br /> DATE: 20-Oct-16 <br /> 8.3 PHOTO DOCUMENTATION <br /> The CQA MONITOR(S)and/or ENGINEER shall photograph all phases of construction. Photographs shall <br /> be identified by location, time, date, and name of the CQA MONITOR(S) and/or ENGINEER taking the <br /> photograph. <br /> 8.4 DESIGN AND SPECIFICATION CHANGES <br /> During construction, the need to address design and SPECIFICATION changes, modifications or <br /> clarifications may arise. In such cases the CQA MONITOR(S)shall notify the MANAGER and ENGINEER. <br /> Design and SPECIFICATION changes shall only be made with written agreement from the ENGINEER. <br /> 8.5 WEEKLY PROGRESS REPORTS <br /> The CQA MONITOR shall prepare weekly progress reports summarizing all construction and CQA <br /> activities. This report shall be submitted to the MANAGER and shall include the following information: <br /> • Date, project name, and location. <br /> • Summary of construction related activities. <br /> • Summary of geomembrane deployed (per day). <br /> • Summary of samples taken and test results, as provided by the CQA MONITOR. <br /> • Summary of geomembrane areas completed. <br /> • Summary of deficiencies and/or defects and resolutions. <br /> • Signature of the CQA MONITOR. <br /> 8.6 MONTHLY CONSTRUCTION REPORTS <br /> The CQA MONITOR shall prepare monthly construction reports summarizing all construction activities. <br /> This report shall be submitted to the MANAGER and shall include the following information: <br /> • Date, project name, and location. <br /> • Health and safety statistics for the project. <br /> • Summary of construction-related activities. <br /> • Summary of deficiencies and/or defects and resolutions. <br /> • Design or SPECIFICATION changes. <br /> S:\ZEPHYR MINERALS\DRMS MINE APPLICATION\01400.2-GEOSYNTHETICS CQA.DOCX <br />
The URL can be used to link to this page
Your browser does not support the video tag.