Laserfiche WebLink
aJ�* <br /> foster <br /> wheeler <br /> Zephyr Gold USA Ltd. PAGE 14 OF 15 <br /> Dawson Gold Project SEC. NO.: <br /> Dawson Filtered Tailings Storage Facility SPECIFICATION 02200.0 <br /> Pre-feasibility Study <br /> TECHNICAL SPECIFICATIONS FOR DATE: (ORIGINAL) <br /> Fremont County, Colorado EARTHWORKS 20-October-16 <br /> PROJECT NO.: 74201633 REVISION: A <br /> DATE: 20-Oct-16 <br /> CONTRACTOR shall place Underdrain Material according to a method specification subject to the approval <br /> of ENGINEER and MANAGER. The preliminary method specification shall be as follows: <br /> • Place Underdrain Material in continuous lifts no more than 12 inches in compacted thickness. <br /> • The material as placed and compacted shall be free from segregation and free of unsuitable <br /> materials. Moisture condition the Underdrain Material prior to compaction, as appropriate, <br /> maintaining the moisture content required to achieve satisfactory compaction. Use moisture <br /> addition procedures during compaction as approved by the MANAGER or ENGINEER. <br /> • Compact Underdrain Material with a minimum of two (2) passes of an approved smooth drum <br /> vibratory roller with a static drum weight between 8 and 12 tons to achieve a target relative density <br /> between 70 and 80%. The number of passes may be modified based on the results of a test fill <br /> completed at the start of the embankment construction and/or as approved by the MANAGER or <br /> ENGINEER. Excessive compaction of the Underdrain Material that could result in particle <br /> breakdown is prohibited. <br /> CONTRACTOR shall minimize the amount of traffic over the Underdrain Material to prevent contamination. <br /> Remove and replace Underdrain Material containing unsuitable material. <br /> 4.5.7 EROSION PROTECTION LAYER <br /> The following placement procedures apply to Erosion Protection Layer as classified by the criteria in Article <br /> 3.6: <br /> The Erosion Protection Layer shall be placed by dozers in a single lift working in an upslope direction. <br /> The filtered tailings surface abutting the erosion protection layer shall be prepared by wetting and <br /> compacting immediately prior to placement of the erosion protection material. <br /> Placement of the Erosion Protection Layer should be concurrent with tailings placement and should be <br /> maintained to the crest of the downstream slope of the FTSF to avoid slopes of exposed tailings. <br /> 4.5.8 RIPRAP <br /> The following placement procedures apply to Riprap as classified by the criteria in Article 3.7: <br /> Placement of Riprap shall begin at the toe of the slope and proceed up the slope. The stones may be <br /> placed by dumping and may be spread with an excavator or other suitable equipment as long as the <br /> underlying material is not displaced. Stones shall be placed so as to provide a minimum of voids. Smaller <br /> S:\ZEPHYR MINERALS\DRMS MINE APPLICATION\02200-EARTHWORKS.DOCX <br />