Laserfiche WebLink
Hydrograph 100-yr Summary Project Name:Dawson Mine <br /> Hydrology Studio v 3.0.0.20 12-15-2021 <br /> Hyd. Hydrograph Hydrograph Peak Time to Hydrograph Inflow Maximum Maximum <br /> No. Type Name Flow Peak Volume Hyd(s) Elevation Storage <br /> (Cfs) (hrs) (Cult) (ft) (Cuft) <br /> 1 NRCS Runoff Basin All 74.14 12.10 241,270 ---- <br /> 2 NRCS Runoff BasinA2 48.44 12.13 172,297 ---- <br /> 3 Rational Pre Basin B 25.97 0.22 20,258 ---- <br /> 4 Rational Post Basin B 40.33 0.22 31,454 ---- <br /> 5 Rational Basin D1 34.88 0.10 12,558 ---- <br /> 6 Rational Pre Basin C 30.05 0.03 3,606 ---- <br /> 7 Rational Post Basin C 61.10 0.03 7,332 ---- <br /> 8 Rational Basin D4 7.903 0.22 6,164 ---- <br /> 9 Junction Basin A 121.6 12.10 413,566 1,2 <br /> 10 Rational Basin D2 29.38 0.20 21,152 ---- <br /> 11 Rational Basin D3 12.04 0.08 3,612 ---- <br /> 12 Junction Post Channel C 70.81 0.03 32,096 7,10,11 <br /> 13 Junction Pre Channel C 39.76 0.03 28,370 6,10,11 <br /> 14 Pond Route Pond 1 16.87 0.28 32,040 12 6277.25 17,062 <br /> 15 NRCS Runoff Basin E 231.6 12.33 1,261,672 ---- <br /> 16 Junction Road ACulvert 231.6 12.33 1,274,230 5,15 <br /> 17 Rational Pre Basin F 26.62 0.23 22,365 ---- <br /> 18 Rational Post Basin F 35.03 0.23 29,427 ---- <br /> B27 <br />