My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-09_PERMIT FILE - M2021046 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021046
>
2022-02-09_PERMIT FILE - M2021046 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:07 PM
Creation date
2/9/2022 2:49:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021046
IBM Index Class Name
Permit File
Doc Date
2/9/2022
Doc Name Note
Appendix N JESIK Surface Water Management
Doc Name
Adequacy Review Response
From
Zephyr Gold USA Ltd
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
800 W.8th Street <br /> ��� Pueblo,Colorado 81003 <br /> (719)582-5588 <br /> www.jesik.us <br /> Contents <br /> INTRODUCTION............................................................................................................................................1 <br /> EXECUTIVE SUMMARY.................................................................................................................................1 <br /> Location & Description.................................................................................................................................2 <br /> Description...............................................................................................................................................3 <br /> HydrologicSoil Groups.................................................................................................................................3 <br /> Climate.........................................................................................................................................................4 <br /> SiteImpacts..................................................................................................................................................4 <br /> Offsite Stormwater Impacts (Basins Al,A2, D1, D2, D3, D4, and E)........................................................4 <br /> Operations Area Site Impacts (Basin B)....................................................................................................5 <br /> Onsite Stormwater Impacts (Basin B, C and F).........................................................................................6 <br /> DrainageBasins............................................................................................................................................7 <br /> MajorDrainage Basin...............................................................................................................................7 <br /> MinorDrainage Basins.............................................................................................................................7 <br /> Basin A—South Offsite Stormwater.....................................................................................................8 <br /> BasinB—Operations Area....................................................................................................................8 <br /> Basin C—Laydown and Stockpile Areas...............................................................................................8 <br /> Basin D— East Offsite Stormwater.......................................................................................................9 <br /> Basin E—Offsite Natural Drainage.......................................................................................................9 <br /> Basin F—Access Road Improvements..................................................................................................9 <br /> STORMWATER MANAGEMENT..................................................................................................................10 <br /> HydrologicCriteria .................................................................................................................................10 <br /> Run-on Water from the South (Basin A) ............................................................................................11 <br /> OperationsArea (Basin B)..................................................................................................................11 <br /> Laydown, Stockpile Area (Basin C) and Detention Pond....................................................................11 <br /> Surface Water Diversion Channels.........................................................................................................12 <br /> Conclusion..................................................................................................................................................13 <br /> APPENDIX A- EXISTING CONDITIONS.........................................................................................................15 <br /> APPENDIX B- HYDROLOGIC CALCULATIONS..............................................................................................16 <br /> APPENDIX C-CHANNEL CALCULATIONS....................................................................................................17 N <br /> 0 <br /> N <br /> 00 <br /> N <br /> c-I <br /> Dawson Mine Surface Water <br />
The URL can be used to link to this page
Your browser does not support the video tag.