Laserfiche WebLink
PROPERTY LEASE AGREEMENT <br /> THIS AGREEMENT ("Agreement") is by and between Mary Louise Adamic, an unmarried <br /> woman, whose address is 860 Chantilly Lane, Idaho Falls, Idaho, 83402, USA, (the "Grantor"), <br /> and Zephyr Gold USA Ltd., a Colorado corporation, doing business at Zephyr Gold USA Ltd., <br /> 402 Valley Road, Suite E, Canon City, CO 81212 (the "Grantee") (Grantor and Grantee, each a <br /> "Party" and collectively the "Parties"). <br /> RECITALS <br /> WHEREAS, Grantor and Grantee each own an undivided fifty percent (50%) interest in <br /> that certain patented mining claim known as the "Fremont Placer Claim", as further described <br /> on Exhibit A, Part 1 attached hereto and by reference made a part hereof, and Grantor is the <br /> owner of one-hundred percent (100%) interest in that certain tract of land known as the Harris <br /> Tract, as further described on Exhibit A, Part 2 (the "Harris Tract) attached hereto and by <br /> reference made a part hereof, located in Fremont County, Colorado (the Fremont Placer Claim <br /> and the Harris Tract, collectively referred to as the"Property"). <br /> WHEREAS, Grantee has patented and unpatented lode mining claims ("Claims") in <br /> Colorado and desires to use the surface of the Property to conduct activities in connection with <br /> the commercial extraction of gold and other metals from the Claims including transportation <br /> ("Operations"); and <br /> WHEREAS, it is the desire of the Parties hereto that Grantee be granted surface rights, <br /> transportation rights, and other related rights necessary for support of its Operations, which will <br /> be deemed to be ongoing in the event of a temporary shutdown while any of the facilities <br /> comprising the Operations are on care and maintenance. <br /> AGREEMENT <br /> NOW, THEREFORE, for good and valuable consideration received, the Parties intend <br /> to be legally bound by this Agreement and agree to the provisions and conditions set forth below. <br /> ARTICLE I <br /> RIGHTS GRANTED <br /> SECTION 1. 1. Surface Rights and Rights to Construct Milling Facilities and Roads. <br /> Grantor does hereby bargain, lease, let and grant unto Grantee the exclusive right and easement <br /> to enter, use, disturb and make improvements, including buildings on the Property that it may <br /> deem reasonably necessary, including without limitation, to construct and operate mining support <br /> facilities and milling facilities, including, but not limited to a mill and dry stack tailing facility,to <br /> support its Operations. Grantee is also granted the right to engineer, construct, maintain, use and <br /> operate, enlarge, and relocate roads across the Property at such locations as Grantee may deem <br /> necessary in connection with its Operations. <br /> 1 <br />