Laserfiche WebLink
Material Kevs <br /> 1:Overburden <br /> 300 2:Sand and Gravel <br /> 3:Weathered Bedrock <br /> 280 4:Stable Bedrock <br /> 0.042 5:Slurry Wall <br /> 260 <br /> 60 ft Offset to Elec Line/Poles <br /> 240 <br /> d <br /> 0 <br /> a <br /> 220 3 <br /> C � J <br /> 200 <n w <br /> — — — — — — — — — — — — — — — — — — — — — — — — — — <br /> 1 — <br /> 180 — _ — _ _ _ _ - - - - _ <br /> 160 <br /> 140 <br /> 120 <br /> 100 <br /> Analysis 1 <br /> Multiple Stability Analysis <br /> 80 Method: Bishop Simplified <br /> Surface: Circular <br /> 60 <br /> Results <br /> 100 150 200 250 300 350 400 450 Critical Factor of Safety: 2.20 <br /> GALENA Vwskkk 72 Licensed to:J&T Consulting <br /> Edited: 1 Apr 2021 <br /> Proiect West Farm Pit Expansion Processed: 1 Apr 2021 <br /> Case 5-3 Full Reservoir-Pseudostatic J&T Consulting,Inc <br /> File:C:\Galena Models\Case 5-3\West Farm Expansion Case 5-3 Full Reservoir-EQ.gmf V <br />