Laserfiche WebLink
Material Keys <br /> 300 1:Overburden <br /> 2:Sand and Gravel <br /> 280 3:Weathered Bedrock <br /> 4:Stable Bedrock <br /> 260 5:Slurry Wall <br /> 240 <br /> _ 80 ft Offset to Canal Bank <br /> E <br /> 220 <br /> C 2 ca <br /> C <br /> 200 U) <br /> 180 t <br /> 160 <br /> 140 <br /> 120 <br /> 100 <br /> Analysis 1 <br /> 80 Multiple Stability Analysis <br /> Method: Bishop Simplified <br /> 60 Surface: Circular <br /> Results <br /> 100 150 200 250 300 350 400 450 Critical Factor of Safety: 1.58 <br /> GALENA version 7.2 Licensed to:J&T Consulting <br /> Edited: 4 Dec 2020 <br /> Proiect West Farm Pit Expansion Processed. 4 Dec 2020 <br /> Case 7-2 Rapid Drawdown <br /> Jar Consulting.Inc. <br /> File:C:\Galena Models\Case 7-2\West Farm Expansion Case 7-2 Rapid Drawdown.gmf V <br />