Laserfiche WebLink
Material Kevs <br /> 1:Overburden <br /> 2:Sand and Gravel <br /> 300 <br /> 3:Weathered Bedrock <br /> 4:Stable Bedrock <br /> 5:Slurry Wall <br /> 250 <br /> 150 ft Offset to Elec/Gas <br /> J � <br /> f�0 <br /> = s <br /> 200 w <br /> *�I --—-—-—-—-— — — -—-—-—-- <br /> I <br /> - - - - - - - - - - - - - - - <br /> 150 <br /> 100 <br /> Analysis 1 <br /> Multiple Stability Analysis <br /> 50 Method: Bishop Simplified <br /> Surface: Circular <br /> Results <br /> 100 150 200 250 300 350 400 450 500 Critical Factor of Safety: 2.40 <br /> GALENA version i.z Licensed to:J&T Consulting <br /> Edited: 2 Dec 2020 <br /> Project West Farm Pit Expansion Processed: 2 Dec 2020 <br /> Case 7-1 Rapid Drawdown <br /> File:C:\Galena Models\West Farm Expansion Case 7-1 Rapid Drawdown.gmf <br /> -, JaT Consulllar,Inc. <br />