Laserfiche WebLink
Material Keys <br /> 1:Overburden <br /> 300 2:Sand and Gravel <br /> 3:Weathered Bedrock <br /> 280 4:Stable Bedrock <br /> 5:Slurry Wall <br /> 260 <br /> 60 ft Offset to Elec Line/Poles <br /> 240 <br /> ? <br /> 0 <br /> .9 cc <br /> — a <br /> 220 <br /> C <br /> ) <br /> C > <br /> 200 � rn W <br /> ' — — — -------•--- <br /> 180 - - - - - _ _ _ _ _ _ _ <br /> 160 <br /> 140 <br /> 120 <br /> 100 Analysis 1 <br /> Multiple Stability Analysis <br /> 80 Method: Bishop Simplified <br /> Surface: Circular <br /> 60 <br /> Results <br /> 100 150 200 250 300 350 400 450 Critical Factor of Safety: 2.96 <br /> GALENA vemon 7.2 Licensed to:J 8 T Consulting <br /> Edded: 1 Apr 2021 <br /> Proiect West Farm Pit Expansion Processed: 1 Apr 2021 <br /> Case 5-3 Full Reservoir <br /> JsT Consulting,Inc. <br /> File:C:\Galena Models\Case 5-3\West Farm Expansion Case 5-3 Full Reservoir.gmf 67, <br />