Laserfiche WebLink
Material Keys <br /> 1:Overburden <br /> 300 2:Sand and Gravel <br /> 3:Weathered Bedrock <br /> 280 4:stable Bedrock <br /> 5:Slurry Wall <br /> 260 <br /> 75 ft Offset to Elec Line/Poles <br /> 240 <br /> a <br /> 0 <br /> E — a_ <br /> 220 /O <br /> J � N <br /> C <br /> � T J <br /> C C <br /> C > y <br /> 200 N w <br /> 180 <br /> 160 <br /> 140 <br /> 120 <br /> 100 <br /> Analysis 1 <br /> 80 Multiple Stability Analysis <br /> Method: Bishop Simplified <br /> Surface: Circular <br /> 60 <br /> Results <br /> 100 150 200 250 300 350 400 450 Critical Factor of Safety: 1.73 <br /> GALENA version lr.2 Licensed to:J i3 T Consulting <br /> Edited: 4 Dec 2020 <br /> Project West Farm Pit Expansion Processed: 4 Dec 2020 <br /> Case 4-1 Rapid Drawdown ■ <br /> '7 JcT Consulllnll,Inc. <br /> File:C:\Galena Models\Case 4-1\West Farm Expansion Case 4-1 Rapid Drawdown.gmT V <br />