Laserfiche WebLink
Material Keys <br /> 1:Overburden <br /> 2:Sand and Gravel <br /> 280 3:Weathered Bedrock <br /> 4:Stable Bedrock <br /> 260 5:Slurry Wall <br /> 240 <br /> 85 ft Offset to Ditch Bank <br /> 220 <br /> L <br /> 200 - - — — — — — — — — — — — — — — — — — — — — — — <br /> in o <br /> 180 <br /> 160 <br /> 140 <br /> 120 <br /> 100 <br /> Analysis 1 <br /> 80 <br /> Multiple Stability Analysis <br /> Method: Spencer-Wright <br /> 60 Surface: Circular <br /> 40 Results <br /> 100 150 200 250 300 350 400 450 Critical Factor of Safety: 3.47 <br /> ° <br /> GALENA vmion 7.z Licensed to:J 8 T Consulting Interslice Force(Final)Angle: 11.6 <br /> Edited: 4 Dec 2020 <br /> Project West Farm Pit Expansion Processed: 4 Dec 2020 <br /> Case 3-1 Full Reservoir <br /> � J[T Consulrinrl,Inc. <br /> File:C:\Galena Models\Case 3-1\West Farm Expansion Case 3-1 Full Reservoir.gmf V <br />