My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-08_REVISION - M2008078
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2022-02-08_REVISION - M2008078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2025 5:00:12 AM
Creation date
2/9/2022 9:18:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
Revision
Doc Date
2/8/2022
Doc Name
Adequacy Review Response
From
Brannan Sand and Gravel Company, LLC
To
DRMS
Type & Sequence
SO4
Email Name
SMS
AME
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3- Pseudo-Static Condition Slope Stability Analysis Results <br /> Description Calculated Required <br /> Factor Minimum <br /> of Safety Factor of <br /> Safety <br /> Case 3-1 -Ditch Bank West of Phase 3-Full Reservoir 2.57 1.3 <br /> Case 3-1 -Ditch Bank West of Phase 3-Rapid Drawdown 1.54 1.3 <br /> Case 3-2-Highway Parcel East of Phase 3-Full Reservoir 2.14 1.15 <br /> Case 3-2-Highway Parcel East of Phase 3-Rapid Drawdown 1.24 1.15 <br /> Case 3-3-Highway Parcel North of Phase 3-Full Reservoir 1.99 1.15 <br /> Case 3-3-Highway Parcel North of Phase 3-Rapid Drawdown 1.16 1.15 <br /> Case 4-1 -Electric Line/Poles East of Phase 4-Full Reservoir 2.32 1.3 <br /> Case 4-1 -Electric Line/Poles East of Phase 4-Rapid Drawdown 1.42 1.3 <br /> Case 4-2-Ditch Bank South of Phase 4-Full Reservoir 2.31 1.3 <br /> Case 4-2-Ditch Bank South of Phase 4-Rapid Drawdown 1.38 1.3 <br /> Case 5-1 -Conservation Easement East of Phase 5-Full Reservoir 1.92 1.15 <br /> Case 5-1 -Conservation Easement East of Phase 5-Rapid Drawdown 1.17 1.15 <br /> Case 5-2-Canal Bank South of Phase 5-Full Reservoir 2.72 1.3 <br /> Case 5-2-Canal Bank South of Phase 5-Rapid Drawdown 2.00 1.3 <br /> Case 5-3-Electric Line/Poles West of Phase 5-Full Reservoir 2.20 1.3 <br /> Case 5-3-Electric Line/Poles West of Phase 5-Rapid Drawdown 1.36 1.3 <br /> Case 6-1 -Conservation Easement East of Phase 6-Full Reservoir 1.97 1.15 <br /> Case 6-1 -Conservation Easement East of Phase 6-Rapid Drawdown 1.17 1.15 <br /> Case 6-2-Canal Bank South of Phase 6-Full Reservoir 2.68 1.3 <br /> Case 6-2-Canal Bank South of Phase 6-Rapid Drawdown 1.82 1.3 <br /> Case 7-1 -Elec/Gas Lines North of Phase 7-Full Reservoir 3.05 1.3 <br /> Case 7-1 -Elec/Gas Lines North of Phase 7-Rapid Drawdown 1.92 1.3 <br /> Case 7-2-Canal Bank South of Phase 7-Full Reservoir 2.23 1.3 <br /> Case 7-2-Canal Bank South of Phase 7-Rapid Drawdown 1.32 1.3 <br /> Case 8-1 -Elec/Gas Lines North of Phase 8-Full Reservoir 3.55 1.3 <br /> Case 8-1 -Elec/Gas Lines North of Phase 8-Rapid Drawdown 2.39 1.3 <br /> Case 8-2-Elec Line/Poles West of Phase 8-Full Reservoir 2.19 1.3 <br /> Case 8-2-Elec Line/Poles West of Phase 8-Rapid Drawdown 1.33 1.3 <br /> Case 8-3-County Road HH.5 South of Phase 8-Full Reservoir 2.70 1.3 <br /> Case 8-3-County Road HH.5 South of Phase 8-Rapid Drawdown 1.77 1.3 <br /> Case 8-4-Highway Parcel East of Phase 8-Full Reservoir 2.14 1.15 <br /> Case 8-4-Highway Parcel East of Phase 8-Rapid Drawdown 1.33 1.15 <br /> VII - CONCLUSIONS AND RECOMMENDATIONS <br /> Case 3-1 -The resulting safety factors of 1.85 (static) and 1.54 (pseudo-static) during a <br /> rapid drawdown condition exceed the minimum required MLRB safety factors of 1.5 <br /> (static) and 1.3 (pseudo-static) for critical structures. The resulting safety factors of 3.47 <br /> (static) and 2.57 (pseudo-static) during a full reservoir condition also exceed the <br /> ' West Farm Gravel Pit Expansion <br /> Slope Stability Analysis <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.