Case 4-1 — Electric Line/Poles to the East of Phase 4. <br /> The proposed setback for mining is 75 feet from the lines/poles. The mining <br /> depth was assumed to be 43 feet in this area based on bore log information in <br /> the geotechnical investigations. <br /> Case 4-2 — Ditch Bank to the South of Phase 4. <br /> The proposed setback for mining is 85 feet from the edge of the ditch bank. The <br /> mining depth was assumed to be 54 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 5-1 — Edge of Conservation Easement to the East of Phase 5. <br /> The proposed setback for mining is 55 feet from the edge of the easement. The <br /> mining depth was assumed to be 39 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 5-2—Canal Bank to the South of Phase 5. <br /> The proposed setback for mining is 75 feet from the edge of the canal bank. The <br /> mining depth was assumed to be 17 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 5-3— Electric Line/Poles to the West of Phase 5. <br /> The proposed setback for mining is 60 feet from the lines/poles. The mining <br /> depth was assumed to be 36 feet in this area based on bore log information in <br /> the geotechnical investigations. <br /> Case 6-1 — Edge of Conservation Easement to the East of Phase 6. <br /> The proposed setback for mining is 50 feet from the edge of the easement. The <br /> mining depth was assumed to be 41 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 6-2 — Canal Bank to the South of Phase 6. <br /> The proposed setback for mining is 75 feet from the edge of the canal bank. The <br /> mining depth was assumed to be 25 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 7-1 — Electric/Gas Lines to the North of Phase 7. <br /> The proposed setback for mining is 150 feet from the electric/gas lines. The <br /> mining depth was assumed to be 56 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 7-2—Canal Bank to the South of Phase 7. <br /> The proposed setback for mining is 80 feet from the edge of the canal bank. The <br /> mining depth was assumed to be 56 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> West Farm Gravel Pit Expansion <br /> Slope Stability Analysis <br /> Page 3 <br />