My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-08_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2022-02-08_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 7:27:38 AM
Creation date
2/8/2022 1:43:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
2/8/2022
Doc Name
Inspection Report (Revised)
From
DRMS
To
Colowyo Coal Company
Inspection Date
2/2/2022
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Highwall Miner. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06A <br /> Topsoil Pile 26A was inspected.The pile was added to later 2021 as additional topsoil stipping occurred along the <br /> Collom Gulch drainage. The pile has been shaped and reseeded prior to the inspection. While limited vegetation <br /> has had the chance to establish,the pile remains stable with no erosion.A topsoil pile marker was observed clearly <br /> designating the pile as such. <br />
The URL can be used to link to this page
Your browser does not support the video tag.