My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-04_PERMIT FILE - P2022002
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2022002
>
2022-02-04_PERMIT FILE - P2022002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:31:34 PM
Creation date
2/7/2022 1:17:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2022002
IBM Index Class Name
Permit File
Doc Date
2/4/2022
Doc Name Note
Public File
Doc Name
Notice Of Intent
From
Salisbury Gladstone LLC
To
DRMS
Email Name
PSH
JLE
SMS
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles,drill pads and collar areas of underground workings,ponds, etc. <br /> No surface/topside disturbance. Stockpiled ore will be stored on the Feed Stock storage <br /> pad as described in the Gladstone I oil Millermi - -Out <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes,diameter,depth,location,etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity N/A Width (ft) N/A Length (ft) N/A <br /> B. Drill Holes: <br /> Diameter <br /> Quantity N/A Depth (ft) N/A (in) N/A <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity N/A Width (ft) N/A Length(ft) N/A Depth(ft) N/A <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance,describe type,quantity and general dimensions: <br /> Remove&Replace existing timbering in accordance with MSHA protocol. Remove Stope Collapse material. <br /> Install Rail, Install air&water lines to facilitate drilling. <br /> Form 2-Public File Page 6 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.