Laserfiche WebLink
SEDCAD 4 for Windows <br /> 5 <br /> Structure Detail: <br /> Pond Inputs: <br /> Initial Pool Elev: 5,601.50 ft <br /> Initial Pool: 0.00 ac-ft <br /> Broad-crested Weir <br /> Weir Width Spil"Elev <br /> (Ft) 00 <br /> 8.00 5,603.50 <br /> Pond Results: <br /> Peak Elevation; 5,603-53 ft <br /> Dewater Time: 0.25 days <br /> Dewateang time is calculated from peak stage to lowest spillway <br /> Elevation-Capacity-Discharge Table <br /> Area Capacity Dr4harge Deivater <br /> Elevation Time <br /> (ac) (ac-ft) (cfs) (hrs) <br /> 5,602.00 0.000 0.000 0.000 <br /> 5,602.25 0.000 0.000 0.000 <br /> 5,4602.50 0.001 0.000 0.000 <br /> 5,602.75 0.002 0.001 0.000 <br /> 5,603.00 0.004 0.001 0.000 <br /> 5,603.25 0.005 0.002 0.000 <br /> 5,603.50 0.006 0.004 0.000 spi"*1 <br /> 5,603.53 0.006 0.004 0.409 6.00 Peak Stage <br /> 5,603,75 0.008 0,006 3.087 <br /> 5,W4.00 0.009 0,008 8.731 <br /> Detailed Discharae Table <br /> Fdename Wed Pad 100 Year sO Printed 12-20-2021 <br /> Blue Mountain Energy 28 Illustration 61 <br />