Laserfiche WebLink
permit boundary. NECC will need to revise the Technical Revision to address the full length of the haul <br /> road to where it connects to an established public road. <br /> Application Form: <br /> 1. The application form does not indicate there is a change in disturbed, permit, or affected area. <br /> This does not appear to be accurate given the extent and length of the haul road. Please revise <br /> this as necessary. <br /> Update Section 2.04 <br /> 2. Please submit the minimum requirements for information on environmental resources required <br /> by Rule 2.04 for any new proposed disturbed and affected area associated with the haul road. <br /> Updated Section 2.05.3(3)—Operations Plan and Road Design <br /> 3. Please revise permit section 2.05.3(c) of the Permit Application Package (PAP)to include the <br /> information required by Rule 2.05.3(c)for the entire length of the proposed haul road. The <br /> designs and plans must comply with the requirements of Rule 4.03.1. <br /> Updated Section 2.05.4- Reclamation Plan <br /> 4. Please update the reclamation plan to account for the entire length of the new haul road in <br /> accordance with Rule 2.05.4. <br /> Update Section 2.05.5—Postmining Land Use <br /> 5. Please update this section of the PAP if necessary in accordance with Rule 2.05.5. <br /> Update Section 2.05.6—Mitigation of the Impacts of Mining Operations <br /> 6. Please update this section of the PAP if necessary in accordance with Rule 2.05.6. <br /> Exhibit 19 <br /> 7. Please provide detailed instructions and appropriate cover pages for the documents to be <br /> included in Exhibit 19 so it is clear these documents pertain to the haul road in question and can <br /> be easily found and referenced in the PAP. <br /> Page 2 of 3 <br />