My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-31_REVISION - M1983013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983013
>
2022-01-31_REVISION - M1983013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 6:56:14 AM
Creation date
1/31/2022 9:54:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983013
IBM Index Class Name
Revision
Doc Date
1/31/2022
Doc Name
Request for Technical Revision
From
Oldcastle SW Group -Bengineers LLC
To
DRMS
Type & Sequence
TR2
Email Name
ACY
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-2 <br /> Co ACY/THM <br /> *� $ COLORADO DIVISION OF RECLAMATION, MININ , rC!"AFWT <br /> *, * 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3 ' <br /> /876 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHN OF RECLAMATION, <br /> File No.: M- Site Name: <br /> Latham 1983013 Latham - Burkett Pit MINING&SAFETY-MINERALS <br /> County Mesa TR# Q, (DBMS Use only) <br /> Permittee:Oldcastle SW Group, Inc. dba United Companies of Mesa County <br /> Operator(If Other than Permittee): <br /> Permittee Representative:Tyra Bartuska <br /> Please provide a brief description of the proposed revision: <br /> Clarification of final reclamation plan: four ponds instead of one. Non-pond disturbance to be <br /> reclaimed to either part of the agricultural laydown yard or revegetated with approved seed <br /> mix. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.