Laserfiche WebLink
Mr. Peter Hays <br /> RE: City of Greeley M-2002-020 <br /> January 20, 2022 <br /> A revised Exhibit F, Reclamation Plan Map illustrating the interconnect pipe location is attached. <br /> The Pond B slurry wall design plan set (AECOM—November 6, 2020) includes the interconnect <br /> pipe design and, therefore, the plan set is also attached. Specific detail for the interconnect pipe is <br /> provided in the design plans on Sheet C-10. <br /> If you have any questions regarding the technical revision or the information and exhibits provided, <br /> please call me directly at(970) 227-2803. <br /> Sincerely, <br /> Blue Earth Solutions, LLC <br /> William Schenderlein, P.E. <br /> Project Manager <br /> Attachments <br /> Page 2 of 2 <br />