Laserfiche WebLink
° WIRELESS RADIO LCP-POND B a <br /> NOTE 2 COM <br /> z SYSTEM POLE <br /> a �7I <br /> P2 <br /> CB1 <br /> � I I PROJECT <br /> Y POUDRE PONDS <br /> I I <br /> IMPROVEMENTS AND <br /> RESTORATION PROJECT <br /> ? 4 4 4 POND B SLURRY WALL <br /> i I I I AND INTERCONNECT PIPE <br /> JJi �L �l Iy FOR CONSTRUCTION <br /> m B ___B___ B____BT___B_ <br /> s I I I \\ <br /> ' CLIENT <br /> ° EXIST XCEL ENERGY I I \ \� \ \Lc City of Greeley <br /> 277/480V UTILITY SERVICE I Vc,"'Al, <br /> P112,800 RMS SYMMETRICAL AMPS P3 <br /> SW1 TO EHH-4, TO PT1, <br /> cE <br /> f PRIMARY METER DISCONNECT SEE E-02 SEE E-02 �uc� SG1 CONSULTANT <br /> 20A13P,NON CURRENT- AECOM <br /> a 20A LIMITING FUSES 1 ELECTRICAL PLAN 7595 TECHNOLOGY WAY <br /> 22kAIC 277/480V,3 PH,4W DENVER,0- 90237 <br /> E-03 NOT TO SCALE T 1-303-740-2800 F 1-303-694-3926 <br /> www aecom corn <br /> EXISTING INLINE THREE PHASE LITHnS <br /> ° METER AND METER SOCKET TO REMAIN ENGINEERING <br /> Ldhos Engineenng <br /> 2750 S Wadsworth Blvd,Sude D-200 <br /> P1 Denver,Colorado 80227 <br /> O <br /> z CB1 Office 303 <br /> O NOTE 1 20'ALUMINUM www IrthosEng com <br /> WIRELESS RADIO POLE,NOTE 3 STANCHION-MOUNTED <br /> SYSTEM <br /> z 20A q <br /> LUMINAIRE,MARK A,SEE <br /> ANTENNA <br /> o \3P NOTE 3 LIGHTING SCHEDULE ON <br /> LSI SHEET E-07 <br /> APPROX LOCATION OF <br /> _ POLE MOUNTED TO <br /> _ — CONCRETE PAD <br /> w LCP-POND B <br /> °O P2 NOTE 3 <br /> CB1 FOR <br /> l <br /> ° /Z20A GALVANIZED STEEL <br /> 3P <br /> 10A C CHANNEL STRUT CONSTRUCTION <br /> w <br /> z <br /> O 480 5 kVA <br /> w <br /> da 15A/1 P <br /> )1DA/3P 120 <br /> a <br /> l�FA <br /> O UPS )15A/1P )15A/1P �9 o <br /> n <br /> w p2 LCP-PONDB _550�1 <br /> 9 NOTE 3 <br /> QE-04 <br /> w L <br /> w C?N P3 P4,P5 to <br /> h WEATHERPROOF <br /> LOCKABLE GFCI RCPT <br /> a WP <br /> o� 5 GFI STANCHION MOUNTED O <br /> n SG 1 LUMINAIRE O ISSUE/REVISION <br /> 0 GALVANIZED STEEL C <br /> ° FINISHED CHANNEL STRUT SQUARE <br /> GRADE MOUNTING PLATE WITH o if/06/2ozo ISSUED FOR CONSTRUCTION <br /> ONE-LINE DIAGRAM CONCRETE ANCHORS,TYP I/R DATE DESCRIPTION <br /> o NOT TO SCALE — — — — — — — — — <br /> a <br /> w <br /> o re <br /> .70 <br /> 0 0_ <br /> 0 <br /> N <br /> P3 <br /> o CONCRETE PAD <br /> a z SEE P1 JA2 <br /> NOTES 5-03 C1,Al <br /> a1 PROVIDE 20 AMP,3 PHASE,22 kAIC SERVICE ENTRANCE RATED ENCLOSED CIRCUIT PROJECT NUMBER <br /> H 3 BREAKER WITH ELECTRONIC TRIP UNIT WITH LSI TRIP FUNCTIONS ELEVATION VIEW Project Number 60609097 <br /> oN <br /> 9 2 BOND GROUND GRID TO STRUT RACK NOT TO SCALE SHEET TITLE <br /> r rFn <br /> N w 3 LCP-POND B,WIRELESS RADIO SYSTEM,AND 20'ALUMINUM POLE SHALL BE PROVIDED AND ONE-LINE DIAGRAM AND <br /> INSTALLED BY OWNER ALL INTERCONNECTING RACEWAY,CONDUCTORS,GROUNDING ELECTRICAL PLAN <br /> ra SYSTEM,AND ALL OTHER ELECTRICAL SYSTEM APPURTENANCES SHALL BE BY THE <br /> a° CONTRACTOR BELOW GRADE RACEWAY STUB-UPS TO LCP-POND B SHALL BE PROVIDED <br /> W E BY THE CONTRACTOR COORDINATE LCP-POND B STUB-UP LOCATIONS WITH OWNER SHEET NUMBER <br /> E-03 <br />