Laserfiche WebLink
DEMOLITION WORK <br /> Task description: Demo of Plant,pipelines,powerlines and parldng lot <br /> Site: Nahcolite Project Permit Action: TR-48 Permit/Job#: M1983194 <br /> PROJECT IDENTIFICATION <br /> Task#: OIA State: Colorado Abbreviation: None <br /> Date: 1/25/2022 County: Rio Blanco Filename: M194-01a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> UNIT COSTS Location adiustment: 95.50% <br /> Structure or Item Demolition Menu <br /> Description Dimensions Selection Quantity Unit Unit Total Cost <br /> Cost <br /> NSI Plant 2001 x 227'W Plant(3S)demo./off-site 1,929,500.00 CF $0.75 $1,447,125.00 <br /> x 42.5'H disposal in approved <br /> landfill-Max.30 mile <br /> haul <br /> Product Storage 95'L x 95'W x Plant(3S)demo./off-site 451,250.00 CF $0.75 $338,437.50 <br /> Dome 50'H disposal in approved <br /> landfill-Max.30 mile <br /> haul <br /> Removal of NSI Plant 2001 x 227'W Demo.and on-site 45,400.00 SF $1.40 $63,741.60 <br /> Slab x 8" disposal in excavated pit, <br /> 8 in.thick-Max.200 ft. <br /> push <br /> Removal of Storage 95'L x 95'W x8" Demo.and on-site 9,025.00 SF $1.40 $12,671.10 <br /> Dome Slab disposal in excavated pit, <br /> 8 in.thick-Max.200 ft. <br /> push <br /> Scale Building 108'W x 181 x Plant(1S)demo./off-site 19,440.00 CF $0.73 $14,152.32 <br /> 10'H disposal in approved <br /> landfill-Max.30 mile <br /> haul <br /> Removal of Scale 108'W x 18'L x Demo.and on-site 1,944.00 SF $1.40 $2,729.38 <br /> Building Slab 8" disposal in excavated pit, <br /> 8 in.thick-Max.200 ft. <br /> push <br /> Tank Farm 30'W x 50'H Haul tank to certified 5.00 EA $760.00 $3,800.00 <br /> salvage dump-3,000 to <br /> 5,000 gal.tank <br /> Removal of 70 SgFt USER PROVIDED 70.00 Ft^2 $5.00 $350.00 <br /> Flagpole/Monument ITEM <br /> Demolition of 6'W x 18'L x Plant(3S)demo./off-site 1,080.00 CF $0.75 $810.00 <br /> Screening and Magnet 10'H disposal in approved <br /> System landfill-Max.30 mile <br /> haul <br /> Pipelines averaged to 34,948 LF Pipe,steel,welded 34,948.00 LF $6.73 $235,200.04 <br /> 10"diam connections- 10 in. <br /> diameter pipe <br /> Total Cost <br /> Subtotal (adjusted for <br /> Job Hours: 80.00 (unadjusted): $2,119,016.94 location): $2,023,661.18 <br />