Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use(check one): <br /> L Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) J—_ Wildlife Habitat(WL) <br /> Residential(RS) �. Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) -_ Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) F Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> FDeveloped Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Scrapers, and front end loaders remove topsoil and a wet dredge is used to mine. <br /> 15. On Site Processing: ✓ Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): Dredged material is transferred to a crushing/screen plant for <br /> processing then stockpiled for use at the concrete and asphalt batch plants.. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This amendment is to add 8.42 acres to the permit area and will become part of the Lake <br /> Marjorie area when reclamation is complete. The new area is part of a land swap deal between <br /> permit line to the Town of Sterling. No changes will be made to the mining or reclamation plans <br /> other then to add the new area. <br />