Change Order ITEM LIST: Routing: CMS#: CT#: <br /> PO#: 2019-0259 <br /> Will work in this CO begin prior to Controller approval? Y (*- N <br /> Select all that apply: <br /> ❑ The situation is an immediate threat to public health, safety or property. <br /> © Process time of normal CO will result in unacceptable delays and/or significant cost increases to the project. <br /> ❑ Other- Explain: <br /> The Changes Fx Explanation for each Item are as fotlows (include cost adjustment): <br /> Add Item#: 13 Cost Change: $1,300.00 <br /> Del Change: Add a gate and rocks to prevent vehicular/motorcycle access to the Freda reclamation <br /> site. <br /> Reason: To prevent access to the reclamation work. <br /> F>:tR: The cost at $1,300.00 additional is fair and reasonable because a typical USES gate <br /> installation costs around $5,000.00 according to Pete from the San Juan Forest. <br /> Add Item#: 12 Cost Change: $500.00 <br /> Del Change: Add removal of the ore bin inside the mill structure to the trash removal bid item 12. <br /> Reason: The ore bin was rusting out and was unsafe. <br /> The cost at $500.00 for removal is fair and reasonable because it took approximately 5 <br /> FaR: hours to remove and haul the bin away, for a total per hour cost of $100/hr which <br /> in - hi enG oa er, a LFUCK, and 2 crew mem e s time. <br /> Add em#: (-Ost Change: <br /> Del Change: <br /> Reason- <br /> FEE R: <br /> Add Item#: Cost Change: <br /> Det Change: <br /> Reason: <br /> F&R: <br /> REMAINDER OF PAGE INTENTIONALLY LEFT BLANK <br /> SIGNATURE PAGE FOLLOWS <br /> Page 2 of 3 <br />