My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-29_GENERAL DOCUMENTS - M1981118
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1981118
>
2018-05-29_GENERAL DOCUMENTS - M1981118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 2:51:22 PM
Creation date
1/21/2022 10:49:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981118
IBM Index Class Name
General Documents
Doc Date
5/29/2018
Doc Name Note
Table Mountain Quarry Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All operations under this section will be under the direct supervision of the PROJECT <br /> MANAGER and work under this section shall be performed only as ordered and directed by the <br /> PROJECT MANAGER. The PROJECT MANAGER will designate the work to be performed <br /> and the order in which it is to be done, and WILL inspect all work. The PROJECT MANAGER <br /> will maintain documentation of the work. <br /> "Operation" means that time spent in performing work as well as time necessary for moving <br /> equipment around the work site when directed by the PROJECT MANAGER. However, <br /> "operation" does not include that time spent in transporting the equipment to the initial work site, <br /> removing the equipment when all work has been completed, transporting the equipment away <br /> from and returning it to the work site in the event of a temporary or seasonal suspension of <br /> operation, maintenance of the equipment, any time during which the equipment is "bogged <br /> down" or otherwise not working, nor for any periods when operations are suspended by the <br /> PROJECT MANAGER. <br /> Measurement and Payment <br /> The number of hours each piece and type of equipment used as directed by the PROJECT <br /> MANAGER under this specification will be counted to the nearest one-half hour. Payment will <br /> be made at the unit price established in Item 8.0 of the Bid Schedule. Such payment shall include <br /> the cost of all materials, accessories, labor, maintenance, operating supplies, salaries of <br /> operators, and any other expenses incidental to the operation of the equipment in the <br /> performance of work in accordance with this specification and bid item(s). No extra payment <br /> will be made for the use of the same equipment while performing work on other bid items on the <br /> Invitation and Bid Sheet or Bid Schedules.No additional payment will be made for hauling <br /> equipment to or away from the work site except as may be proper under <br /> Mobilization/Demobilization. <br /> ITEM 9.0 ADDITIONAL WEED CONTROL <br /> This item covers the work required to complete up to two (2) acres of additional weed control on <br /> the site as directed by the PROJECT MANAGER. This item will be performed only if additional <br /> weed control is required beyond the original estimate and only as directed by the PROJECT <br /> MANAGER. Weed control will be accomplished according to the specifications of Item 5.0. <br /> Measurement and Payment <br /> Payment for this item will be made at the unit prices established in Item 9.0 of the Bid Schedule. <br /> Measurement for payment will be made to the nearest half(0.5) acre. The prices bid for <br /> additional weed control will cover all costs for completing the activities required under this item. <br /> Payment shall be as this item is completed and approved by the PROJECT MANAGER. Such <br /> payment shall be considered full compensation for all labor, materials, equipment and all other <br /> items necessary and incidental to the completion of Item 9.0. <br /> Page 15 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.