Laserfiche WebLink
29 <br /> C&J Gravel private property reclamation cost (see map L3) <br /> -9.98 acres: this area is only covering the batch plant, office, mechanic shop and lay down yard. <br /> 1. Rip the existing floor <br /> -D10T: 10 hours $2,500 <br /> A. 9.98 acres <br /> B. 12" rip depth <br /> 2. Place overburden over the disturbed area <br /> -D10T: 5.15 hours$1,287.50 <br /> -A35-C: 18.71 hours $1,440.67 <br /> -Cat 982M: 3.38 hours $559.39 <br /> A. 9.98 acres <br /> B. 9.98 acres @ 6" = 7,728.51 yds3 dirt <br /> C. 1,000' maximum haul distance from loadout zone; using a Volvo A35-C <br /> D. 7,728.51 = 19 = 406.76 loads @ 2.76 min per load <br /> I. 30 second load time. 2 passes with a Cat 982M <br /> II. 1.51 minutes round trip @15mph <br /> 111. 45 seconds to dump <br /> E. Cat 982M: 406.76 loads @30 seconds per load = 3.38 hours <br /> F. Cat MOT: 7,728.51 yds @ 1,500 hour= 5.15 hours <br /> 3. Seeding <br /> -10 hours labor$250 <br /> -225.54 pounds$2,255.40 <br /> A. 9.98 acres <br /> B. 225.54 pounds of seed hand broadcasted @ 22.6 pounds per acre <br /> 4. We also plan on leaving all existing roads and will not be reclaiming those for future <br /> access and development purposes <br /> Summary <br /> Cat D10T:$3,787.50 <br /> Cat 982M:$559.39 <br /> Volvo A-35:$1,440.67 <br /> Labor: $250 <br /> Seed: $2,255.40 <br /> $8,292.96 <br />