Laserfiche WebLink
26 <br /> C&J Gravel BLM active current stockpile area ( see map 1-2) <br /> 36.01 acres of active pit floor (on BLM property, not including slopes) <br /> 1. Southwest slope shaping on Southern boundary: <br /> -D10T: 8 hours$2,000 <br /> A. 2.23 acres <br /> B. 120' maximum push <br /> 2. Shape dirt slopes of old Southern mining hole: <br /> -D10T: 60 hours $15,000 <br /> A. 4.78 acres <br /> B. 150' maximum push <br /> 3. 3:1 dirt slope on the pool table East of the stationary crusher <br /> -D10T: 3hours $750 <br /> A. .75 acres <br /> B. 70' maximum push <br /> 4. Fill the remainder of the northern hole <br /> -D10T: 6 hours $1,500 <br /> A. .83 acre <br /> B. 200' maximum push <br /> 5. Rip existing pit floor <br /> -D10T: 36.01 hours $9,002.50 <br /> A. 12" rip depth <br /> B. 36.01 acres <br /> 6. Place overburden over the pit floor <br /> -D10T: 18.59 hours $4,647.50 <br /> -A35-C: 48.93 hours $ 3,767.61 <br /> -982M: 12.23 hours $ 2,024.06 <br /> A. 36.01 acres <br /> B. 36.01 acres @ 6" = 27,890.96 yds3 dirt <br /> C. 500' maximum haul distance from numerous loadout zones; using a Volvo A35-C. <br /> D. 27,890.96 yds3_ 19= 1,467.94 loads @ 2.00 min per load <br /> I. 30 second load time. 2 passes with a Cat 982M <br /> II. 45.44 seconds drive to dump site and back @ 15MPH <br /> 111. 45 seconds to dump material <br /> E. Cat 982M: 1,467.94 loads @ 30 seconds per load = 12.23 hours <br /> F. Cat MOT: 27,890.96 yds3 @ 1,500 yds3 hour= 18.59 hours <br />