Laserfiche WebLink
23 <br /> Exhibit L: Reclamation cost <br /> - reclamation cost: current mining area <br /> 35.43 acres (See Map L1) <br /> 1: Northwest corner shaping 7.05 acres: <br /> -Cat D10T: 30 hours $7,500 <br /> A. 7.05 acres <br /> B. 200' maximum push <br /> 2: Southwest corner shaping <br /> -Cat D10T: 8 hours $2,000 <br /> A. 1.44 acres <br /> B. 150' maximum push <br /> 3: Northwest slope soil placement (Map 1) <br /> -Volvo A35-C: 12.58 hours $968.66 <br /> -Cat 982M: 2.39 hours $395.54 <br /> -Cat D10T 3.64 hours $910 <br /> A. 7.05 acres: 6" overburden = 5,460yd3 <br /> B. 816' maximum haul distance <br /> C. A-35C: 287 loads @ 2.63 min per load <br /> I. 30 second load time. 2 passes with a Cat 982M <br /> II. 1.23 minutes haul time roundtrip @ 10MPH <br /> III. 45 seconds to dump material <br /> D. Cat 982M: 287 loads @ 30 seconds each = 2.39hrs <br /> E. Cat D10T: 5,460yds3 @ 1,500yds3 hour= 3.64hrs <br /> 4. Southwest slope soil placement <br /> -Volvo A35-C: 2.58 hours $198.66 <br /> -Cat 982M: .49 hours $81.09 <br /> -Cat D10T: .74 hours $185 <br /> A. 1.44 acres: <br /> B. 1.44 acres @ 6" = 1,119.2 yds3 dirt <br /> C. 816' maximum haul distance <br /> D. A35-C: 58.90 loads @ 2.63 min per load <br /> I. 30 second load time. 2 passes with a Cat 982M <br /> II. 1.23 minutes haul time @10mph <br /> III. 45 seconds to dump material <br /> E. Cat 982M: 58.9 loads @ 30 seconds each = .49hour <br /> F. Cat D10T: 1,119.2yds3 @1,500yds3 hour= .74hour <br />