My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-19_REVISION - C1981022 (19)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2022-01-19_REVISION - C1981022 (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 12:45:34 PM
Creation date
1/20/2022 8:15:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
1/19/2022
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
SL5
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III GVB-LW-9-02 USFS 2010 SL-2 SL-2 0.42 *See SL-2 <br /> III GVB-LW-9-03 USFS 2009 SL-2 SL-2 0.4 *See SL-2 <br /> III GVB-LW-9-04 BLM 2010 SL-2 SL-2 0.39 *See SL-2 <br /> III GVB-LW-10-01 USFS 2007 SL-2 SL-2 0.93 *See SL-2 <br /> III GVB-LW-10-02 USFS 2009 SL-2 SL-2 0.31 *See SL-2 <br /> GVB-LW-10-03,- <br /> III 03B and-03C USFS 2009 SL-2 SL-2 1.23 *See SL-2 <br /> III GVB-LW-10-04 BLM 2010 SL-2 SL-2 0.36 *See SL-2 <br /> III GVB-LW-11-01A USFS 2008 SL-2 SL-2 0.33 *See SL-2 <br /> III GVB-LW-11-01B USFS 2007 SL-2 SL-2 0.15 *See SL-2 <br /> III GVB-LW-11-02 Hotchkiss Ranches 2010 SL-2 SL-2 0.43 *See SL-2 <br /> III GVB-LW-11-03 Hotchkiss Ranches 2012 SL-2 SL-2 0.22 *See SL-2 <br /> III GVB-LW-12-01 Hotchkiss Ranches 2007 SL-2 SL-2 0.79 *See SL-2 <br /> III GVB-LW-12-02 Hotchkiss Ranches 2010 SL-2 SL-2 0 *See SL-2 <br /> III oB LW-12-03,Pad Hotchkiss Ranches 2008 SL-2 SL-2 0.5 *See SL-2 <br /> nly <br /> III V13-1S-01 BLM 2010 SL-2 SL-2 0.43 *See SL-2 <br /> Total Acreage for <br /> SL-5 31.12 <br /> Several sites were included in the SL-5 application,but are not included in Table 1: <br /> • The Bear Creek B Seam Portal,Bear Creek Fan Area(U.S. Steel),Hubbard Creek Fan 91 Site <br /> and Lower Hubbard Creek areas were all released with SL-4 <br /> • The Elk Creek Temporary Conveyor crosses the SL-I parcels,for which Phase I bond release <br /> was already issued, and a parcel of land for which no Phase I application has been received, so it <br /> has been removed from SL-5 <br /> • Upper Hubbard Creek(AKA Somerset Mine Hubbard Fan Shaft#1)has not been reclaimed <br /> according to the currently approved plan, so it has been removed from SL-5. In order to make <br /> the area eligible for bond release, Oxbow Mining,LLC should either implement the currently <br /> approved reclamation plan, or submit a Technical Revision to revise the plan (see the MT-8 <br /> findings document for further detail). <br /> • The Bear Creek Cutoff LU Road is not shown on Map 2.05-MI and its location could not <br /> identified. It was not included in the SL-2 bond release, and it has been removed from SL-5. <br /> II. CRITERIA AND SCHEDULE FOR BOND RELEASE <br /> P14ASEI <br /> Rule 3.03.1(2)(a) states, "Up to sixty percent of the applicable bond amount shall be released when the <br /> permittee successfully completes backfilling,regrading, and drainage control in accordance with the <br /> approved reclamation plan." The reclamation plan for the Elk Creek Mine is found in section 2.05.4 of <br /> the Permit Application Packet(PAP). <br /> With regard to Phase I bond release,the approved reclamation plan for the Elk Creek Mine calls for: <br /> • Removal and salvage or demolition and disposal of any surface structures and facilities not <br /> approved for retention to support the post-mining land use <br /> • Sealing and backfilling of all mine openings and any wells that will not be retained for <br /> monitoring or water supply <br /> C-1981-022 Page 6 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.