My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-19_REVISION - M1976007UG (135)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976007
>
2022-01-19_REVISION - M1976007UG (135)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 7:19:07 AM
Creation date
1/19/2022 9:10:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976007UG
IBM Index Class Name
Revision
Doc Date
1/19/2022
Doc Name
Comment/Objection
From
Ian Wilson
To
DRMS
Type & Sequence
CN1
Email Name
ECS
MAC
Media Type
D
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 <br />DM/DFB/ae(Mt Arthur Modification) <br />Project No. G1602 <br />January 2013 <br /> <br /> <br /> <br /> <br />REPORT ON <br /> <br />MT ARTHUR COAL OPEN CUT MODIFICATION <br />GROUNDWATER IMPACT ASSESSMENT <br /> <br /> <br /> <br />1.0 INTRODUCTION <br /> <br />Hunter Valley Energy Coal Pty Ltd (HVEC), a wholly owned subsidiary of BHP Billiton Ltd, is <br />proposing to extend the currently approved open cut mine footprint at the Mt Arthur Coal Mine. As <br />such, it is seeking approval for a modification to its approved Mt Arthur Consolidation Project from <br />the Minister of Planning and Infrastructure, under section 75W of the New South Wales (NSW) <br />Environmental Planning and Assessment Act 1979. <br /> <br />HVEC has two current approvals for the Mt Arthur Coal Mine, these being: <br /> <br />• PA09_0062 granted on 24 September 2010 for the Mt Arthur Coal Consolidation Project. <br />This approval is for open cut mining and infrastructure and allows a mining rate of up to <br />32 million tonnes per annum (Mtpa); and <br />• PA06_0091 granted on the 2 December 2008 for underground mining at the rate of 8 Mtpa. <br /> <br />The Mt Arthur Coal Open Cut Modification (the Modification) includes the continuation of open cut <br />mining operations at the Mt Arthur Coal Mine for an additional operational life of approximately four <br />years (i.e. from Year 2022 to Year 2026). <br /> <br />The Modification involves an expansion of the open cut disturbance area to the south-west, as <br />shown on Figures 1 and 2. The Modification Area lies between the approved open cut mine and <br />the approved underground mine (Figure 2). <br /> <br />Australasian Groundwater and Environmental Consultants Pty Ltd (AGE) were commissioned by <br />HVEC to undertake a groundwater impact assessment of the proposed Modification. This report, <br />which describes the groundwater impact assessment, forms part of the Environmental <br />Assessment (EA) being prepared by Resource Strategies Pty Ltd, in support of the application for <br />approval of the Modification. <br /> <br />The report describes the hydrogeological regime of the Site area and identifies potential risks and <br />constraints. The assessment is based on a refined three-dimensional transient, groundwater flow <br />model of the Mt Arthur Coal Mine that was originally developed in 2009 for the Mt Arthur Coal <br />Consolidation Project EA and has been updated to include the Modification. <br /> <br />In the context of this report, the term Site refers to the Mt Arthur Coal Mine Site and the term MAU <br />is used to describe the Mt Arthur Underground Mine. The Model Area/Boundary refers to the <br />extent of the numerical model footprint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.