My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-19_REVISION - M1976007UG (135)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976007
>
2022-01-19_REVISION - M1976007UG (135)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 7:19:07 AM
Creation date
1/19/2022 9:10:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976007UG
IBM Index Class Name
Revision
Doc Date
1/19/2022
Doc Name
Comment/Objection
From
Ian Wilson
To
DRMS
Type & Sequence
CN1
Email Name
ECS
MAC
Media Type
D
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page iv <br />Mt Arthur Coal Open Cut Modification (Project No. G1602) <br /> <br />TABLE OF CONTENTS <br />(Continued) <br />Page No. <br /> <br />List of Tables: <br /> <br />Table 1: Average Monthly Precipitation Jerrys Plains Post Office (061086) (1884 to 2012)................................................................ 18 <br />Table 2: Details of Seams being Mined by HVEC ................................................................................................................................ 23 <br />Table 3 : Groundwater Quality-Alluvium............................................................................................................................................... 31 <br />Table 4: Pre-Mining Groundwater Quality-Permian Groundwater Systems ......................................................................................... 35 <br />Table 5: Monitoring Bores along the Hunter River ............................................................................................................................... 36 <br />Table 6: Summary of Groundwater Model Parameters ........................................................................................................................ 56 <br />Table 7: Steady State Model Calibration Results ................................................................................................................................ 57 <br />Table 8: Model Steady State Water Budget ........................................................................................................................................ 61 <br />Table 9: Simulated Groundwater Discharge to the Creeks and Hunter River ..................................................................................... 61 <br />Table 10: Predicted Average Inflow to the Pits (ML/day) .................................................................................................................... 67 <br />Table 11: Predicted Flux to and from Alluvium (ML/day) .................................................................................................................... 72 <br />Table 12: Pit Lake Recovery Model Scenarios .................................................................................................................................... 79 <br />Table 13: Groundwater Licence Summary .......................................................................................................................................... 82 <br />Table 14: Licensing Requirement Summary ....................................................................................................................................... 82 <br /> <br />List of Figures: <br /> <br />Figure 1: General Location Plan ............................................................................................................................................................ 2 <br />Figure 2: Mt Arthur Mine Modification Study Area.................................................................................................................................. 3 <br />Figure 3: Locality Map for the Hunter Regulated River Water Sharing Plan ......................................................................................... 9 <br />Figure 4: Water Sharing Plan Area for the Hunter Unregulated and Alluvial Water Sources.............................................................. 10 <br />Figure 5: Buffer Zone Requirement for Open Cut Mining Operations Next to Rivers/Alluvium ........................................................... 12 <br />Figure 6: Three-Dimensional View of Mt Arthur Coal Mine .................................................................................................................. 18 <br />Figure 7: Existing Mine Leases and Conceptual Model Area .............................................................................................................. 19 <br />Figure 8: Jerrys Plains Post Office (061086) Monthly Rainfall Data and CRD..................................................................................... 20 <br />Figure 9: Stratigraphic Column ............................................................................................................................................................ 22 <br />Figure 10: Geology Map and Major Structures .................................................................................................................................... 24 <br />Figure 11: Overview of Main Faults and Structures within Mt Arthur Coal Mine and Surrounds ......................................................... 25 <br />Figure 12: Monitoring Bore and NOW Registered Bore Location ........................................................................................................ 28 <br />Figure 13: Interpreted Groundwater Table ........................................................................................................................................... 34 <br />Figure 14: Hydrographs of Selected Monitoring Bores along the Hunter River ................................................................................... 37 <br />Figure 15: Electrical Conductivity Trends of Monitoring Bores............................................................................................................. 38 <br />Figure 16: Hydrographs of Permian Coal Measures Monitoring Bores-Saddlers Creek ...................................................................... 39 <br />Figure 17: Hydrographs of Permian Coal Measures Monitoring Bores – North-West.......................................................................... 40 <br />Figure 18: Hydrographs of Permian Coal Measures Monitoring Bores – South-East .......................................................................... 40 <br />Figure 19: Updated Mine Plan 2016 to 2026 ....................................................................................................................................... 43 <br />Figure 20: Model Area and Finite Element Mesh (FEM) and Boundary Conditions............................................................................. 46 <br />Figure 21: Structure Contours of base of Layer 4 (top Mt Arthur Seam) and Hydraulic Conductivity Distribution ............................... 48 <br />Figure 22: Structure Contours of base of Layer 6 (Bayswater Seam) and Hydraulic Conductivity Distribution ................................... 49 <br />Figure 23: Structure Contours of base of Layer 7 (Base Ramrod Seam) and Hydraulic Conductivity Distribution .............................. 50 <br />Figure 24: Three-Dimensional Model Mesh ......................................................................................................................................... 51 <br />Figure 25: Assumed Low Conductivity Zone with Nearby Monitoring Bores........................................................................................ 52 <br />Figure 26: Long Sections - Hydraulic Conductivity .............................................................................................................................. 54 <br />Figure 27: Recharge Distribution ......................................................................................................................................................... 55 <br />Figure 28: Calibrated Steady State Observed vs. Modelled Heads Scatter Plot ................................................................................. 58 <br />Figure 29: Calibrated Steady State Water Table Contours .................................................................................................................. 59 <br />Figure 30: Transient Verification Hydrographs Associated with Alluvium ............................................................................................ 62
The URL can be used to link to this page
Your browser does not support the video tag.