Laserfiche WebLink
B.15.4. Apparatus <br /> • Well location map <br /> • Electric water level sounder <br /> • Measuring tape with engineering scale (required if graduations on water-level sounder or <br /> interface probe are greater than 1/100 of a foot) <br /> • deionized water in a squeeze wash bottle <br /> • Compressed-nitrogen tank (required when using compressed nitrogen) <br /> • Compressed-gas regulator (required when using compressed nitrogen) <br /> • Nitrogen-jetting well-head apparatus (required when using compressed nitrogen) <br /> • Flexible compressed-gas transmission hose (required when using compressed nitrogen) <br /> • Threaded PVC pipe (required when using compressed nitrogen) <br /> • Jetting-T (required when using compressed nitrogen) <br /> • Suction-lift pump (optional) <br /> • PVC hose (optional) <br /> • Foot valve (optional) <br /> • Black permanent marking pen <br /> • Black ink pen <br /> • Safety equipment as required by NS safety procedures <br /> B.15.4.1. Procedures <br /> This procedure is composed of three sections: Inspection and Documentation, Maintenance <br /> Criteria and Corrective Action Protection, and Redevelopment Procedures. <br /> B.15.4.2. Inspection and Documentation <br /> Each item on the Field Data Sheet shall be completed as the inspection is conducted. <br /> Corrective action to eliminate deficient aspects of a well installation is described in the Section <br /> B.14.5 Maintenance Criteria and Corrective Action Protection. <br /> B.15.4.3. Surface Components Inspection <br /> The first step of the inspection is to inspect the above-ground components of a monitoring-well <br /> installation. Some surface components identified in this section of the procedure are optional <br /> and will not be required at each well installation. An example is guard posts. The Project <br /> Manager and well technician shall determine which components are required. <br /> • Check for presence of a lid on the steel security casing if used. If damaged, describe <br /> damage in the field data sheet. <br /> • Check the lock on the steel security casing for proper operation if used. <br /> • NS utilizes modified plastic drum enclosures to protect the in-field monitor wells. The <br /> structures are secured to a concrete pad and the doors are padlocked. Check the lock on <br /> the drum and the structural integrity of the drum itself. <br /> • Inspect the steel security casing for damage if used. <br /> • Inspect the casing riser for damage. No contamination should be able to enter the well <br /> through openings in the side of the casing riser. Note that some casing risers have a weep <br /> Daub &Associates, Inc. Page B-35 Natural Soda LLC 2022 SAP <br />