My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-18_GENERAL DOCUMENTS - C1992081
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1992081
>
2022-01-18_GENERAL DOCUMENTS - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2022 3:54:31 PM
Creation date
1/18/2022 3:18:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
General Documents
Doc Date
1/18/2022
Doc Name Note
For SL2
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL2
Permit Index Doc Type
Findings
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1. SL-2 Reclamation Cost Summary HGL <br /> COST SUMMARY WORK <br /> Task description: Remaining after SL2 approval <br /> Site: Hayden Gulch Loadout Permit Action: PR2/SL2 Permit/Job#: C1992081 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 10/12/2021 County: Routt Filename: C081-000 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Form Fleet Task <br /> Task Description Used Size Hours Cost <br /> 002 Regrade Rail Spur 10% remaining DOZER 1 10.99 $4,428 <br /> 007 Rip Haul Road HGLF-HR1 RIPPER 1 2.65 $1,108 <br /> 011 Regrade Haul Road HGLF-HR1 DOZER 1 6.34 $2,641 <br /> 015 Finish Grade Remaining Disturbed Area GRADER 1 1.81 $327 <br /> 020 Regrade Remaining Ditches DOZER 1 1.68 $678 <br /> 025 Replace Topsoil on Rail Spur SCRAPERI 1 2.59 $2,324 <br /> 031 Drill Seed Mix#1 REVEGE 1 57.20 $3,410 <br /> 033 Drill Seed Mix#3 REVEGE 1 42.90 $3,541 <br /> 041 Site Maintenance over 10 year liability period SITEMAINTEN 1 20.00 $2,910 <br /> ANCE <br /> 045 Mob/Demob equip.for Reclamation of Loadout MOBILIZE 1 3.60 $7,917 <br /> Area and TAHR <br /> 501 Rip TAHR RIPPER 2 55.40 $46,596 <br /> 502 Remove TAHR Surface Material to Pit SCRAPERI 2 104.56 $214,803 <br /> 503 Grade TAHR to Blend GRADER 1 66.61 $12,333 <br /> 504 Replace Topsoil from Stockpile A to TAHR Stations SCRAPERI 2 33.69 $69,211 <br /> 114 to 216 <br /> 505 Replace Topsoil from Stockpile C to TAHR Stations SCRAPERI 2 27.76 $57,021 <br /> 92 to 144 <br /> 506 Replace Topsoil from Stockpile D to TAHR Stations SCRAPERI 2 9.64 $19,802 <br /> 76 to 92 <br /> 507 Replace Topsoil from Stockpile E to TAHR Stations SCRAPERI 2 15.58 $32,005 <br /> 40 to 76 <br /> 508 Replace Topsoil from Stockpile F to TAHR Stations SCRAPERI 2 7.02 $14,412 <br /> 16to40 <br /> 509 Replace Topsoil from Stockpile G to TAHR Stations SCRAPERI 2 4.55 $9,352 <br /> 0 to 16 <br /> 510 Drill Seed Mix 5 on TAHR REVEGE 1 24.40 $11,838 <br /> 511 Drill Seed Mix 3 on TAHR REVEGE 1 18.80 $9,121 <br /> 512 Drill Seed Cropland on TAHR REVEGE 1 66.90 $19,067 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.