Laserfiche WebLink
David King <br /> January 14,2022 <br /> Page 3 of 11 <br /> (d)the total area to be involved in the operation, including the area to be mined and the area of affected lands(see <br /> definition of"Affected Land"); <br /> (e)the type of present vegetation covering the affected lands; and <br /> (f)in conjunction with Exhibit G-Water Information, Subsection 6.4.7, if required by the Office, further water <br /> resources information will be presented on a map in this section. <br /> (g) Show the owner's name,type of structures, and location of all permanent or man-made structures contained on <br /> the area of affected land and within two hundred(200) feet of the affected land. <br /> (h)In conjunction with Exhibit I- Soils Information, Subsection 6.4.9,soils information may be presented on a <br /> map in this section; <br /> (i)Aerial photos, if available,may be included in this section. <br /> 1) Please show the locations and expected volumes of the topsoil and overburden stockpiles on the Mining <br /> Plan map. Only one location is shown on figure C2,but Section B 1. a. states that topsoil will be placed <br /> in the south areas of Phases 1,2 and 4. Keep in mind the rule requires that topsoil and overburden be <br /> managed separately. <br /> 2) Please clarify if the 35*Avenue ROW is currently included in the proposed permit boundary— The <br /> provided acreages appear to include this parcel,but it is not included in the Permit Boundary as shown <br /> on Figure C3 or other maps. <br /> 3) Why is there a permit boundary line between Survey Parcels I and 2 on figure C3? Please revise <br /> permit boundary to be clear and consistent on all provided figures. <br /> 4) To better address the requirements of Exhibit C(b)and(g)above, as well as Exhibit S,Please provide <br /> a separate figure that identifies all structures and utilities within and within 200'of the permit and <br /> correlate those with the proper structure owner information. <br /> 5) Please clearly define the 12 acre Hot Plant area, and the 11 acre Wet Plant area clearly on the Mine <br /> Plan map figure C2). There appears to be some discrepancy between what is illustrated on the main <br /> map,vs. what is shown on the inset mine phases depicted below,especially with respect to the extent of <br /> the Wet Plant area. <br /> 6) Will there be enough area in the Wet Plant area to keep all raw material and product stockpiles out of <br /> the floodway? Where will this material be placed? <br /> 7) What are the white shapes in the Hot Plant area of figure C2 and on Exhibit F representing? <br /> 8) Please resolve the discrepancy between the acreages listed on C2 which indicate that 79 acres will be <br /> stripped in 2022, and the maximum disturbed acres at any one time of 58 acres shown on figure F. <br /> EXHIBIT D-Mining Plan (Rule 6.4.4): The mining plan shall supply the following information, correlated <br /> with the affected lands,map(s)and timetables: <br /> (a)description of the method(s)of mining to be employed in each stage of the operation as related to any surface <br /> disturbance on affected lands; <br />