My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-03_PERMIT FILE - M2022001 (8)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022001
>
2022-01-03_PERMIT FILE - M2022001 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 3:10:03 AM
Creation date
1/4/2022 9:59:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022001
IBM Index Class Name
Permit File
Doc Date
1/3/2022
Doc Name
Application
From
Civil Resources, LLC
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The revegetation seeding and plant list on the Reclamation Plan Map contains the <br /> preferred species of grasses, shrubs and trees to be planted. <br /> Seeding will take place once final grading and replacement of topsoil have been completed <br /> for each phase. Timing of seeding will be consistent with standard horticultural practice for <br /> dryland applications-generally between late September and the middle of April to ensure <br /> there is adequate moisture for germination. <br /> (e) A plan or schedule indicating how and when reclamation will be implemented. <br /> Include: <br /> i. An estimate of the periods of time which will be required for the various stages or <br /> phases of reclamation. <br /> Reclamation for any given stage of mining may take up to five years to allow for successful <br /> revegetation. Please refer to the Timetable for Mining and Reclamation in Section (e) of <br /> Exhibit D. <br /> ii. A description of the size and location of each area to be reclaimed during each <br /> phase. <br /> Please refer to the Reclamation Plan Map(Exhibit F). <br /> iii. Outlining the sequence in which each stage or phase of reclamation will be carried <br /> out. <br /> Please refer to the Timetable for Mining and Reclamation in Section (e)of Exhibit D. <br /> (f) A description of.- <br /> I. Final grading-maximum anticipated slope gradient or expected ranges thereof; <br /> The finished slopes of the reservoir will be no steeper than 3:1 for slopes mined at a 3:1. If <br /> slopes were mined at a steeper slope, the slope will be reclaimed with a 4:1 clay liner. <br /> ii. Seeding-types, mixtures, quantities and time of application; <br /> Please refer to the Reclamation Plan Map for the list of plant materials and seeds to be <br /> utilized. The operator will seed during the appropriate season to ensure adequate <br /> moisture for germination and implement weed controls to allow the grasses to successfully <br /> establish. Additional plantings may be installed once the reservoirs are full of water and <br /> the grasses are established. <br /> iii. Fertilization-types, mixtures, quantities, and time of application; <br /> The type and application rate of fertilizer shall be determined based on a soil test at the <br /> time of final reclamation. <br /> iv. Revegetation-types of trees, shrubs, etc.; <br /> The site is historically flood irrigated farmland.The site will be revegetated with an upland <br /> grass seed mix in areas that are above the highwater line or are graded back to native <br /> grade. <br /> Section 20-Gravel Mine—MLRB 112 Permit Application <br /> Exhibit E-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.