Laserfiche WebLink
• The facility discharges more than 1,000 gallons of oil into or upon the navigable waters <br /> of the U.S. or adjoining shorelines in a single spill event; or <br /> • The facility discharges oil in quantity greater than 42 gallons in each of two spill events <br /> within any 12-month period. <br /> • Review the SPCC Plan at least once every five (5) years and amend it to include more <br /> effective prevention and control technology, if such technology will significantly reduce <br /> the likelihood of a spill event and has been proven effective in the field at the time of the <br /> review. Plan amendments, other than administrative changes discussed above, must be <br /> recertified by a Professional Engineer on the certification page in Section 1.2 of this <br /> Plan. <br /> • Amend the SPCC Plan within six (6) months whenever where is a change in facility <br /> design, construction, operation, or maintenance that materially affects the facility's spill <br /> potential. The revised Plan must be recertified by a Professional Engineer (PE). <br /> Review the Plan on an annual basis. Update the Plan to reflect any "administrative changes" <br /> that are applicable, such as personnel changes or revisions to contact information, such as <br /> phone numbers. Administrative changes must be documented in the Plan review log, but do not <br /> have to be certified by a PE. <br /> SPCC— YRR 2 Lewicki&Associates <br /> Date, YEAR <br />