Laserfiche WebLink
Table of Contents <br /> INTRODUCTION ....................................................................................................................... 1 <br /> PART 1: PLAN ADMINISTRATION............................................................................................ 3 <br /> 1.1 Management Approval and Designated Person (40 CFR 112.7).................................. 3 <br /> 1.2 Professional Engineer Certification (40 CFR 112.3(d))................................................. 4 <br /> 1.3 Location of SPCC Plan (40 CFR 112.3(e))................................................................... 5 <br /> 1.4 Plan Review (40 CFR 112.3 and 112.5)....................................................................... 5 <br /> 1.5 Facilities, Procedures, Methods, or Equipment Not Yet Fully Operational (40 CFR <br /> 112.7 6 <br /> 1.6 Cross-Reference with SPCC Provisions (40 CFR 112.7)............................................. 6 <br /> PART 2: GENERAL FACILITY INFORMATION ......................................................................... 9 <br /> 2.1 Facility Description (40 CFR 112.7(a)(3))..................................................................... 9 <br /> 2.1.1 Location and Activities................................................................................................. 9 <br /> 2.2 Evaluation of Discharge Potential ...............................................................................11 <br /> PART 3: DISCHARGE PREVENTION - GENERAL SPCC PROVISIONS.................................12 <br /> 3.1 Compliance with Applicable Requirements (40 CFR 112.7(a)(2)) ...............................12 <br /> 3.2 Facility Layout Diagram (40 CFR 112.7(a)(3)).............................................................12 <br /> 3.3 Spill Reporting (40 CFR 112.7(a)(4)) ..........................................................................12 <br /> 3.4 Potential Discharge Volumes and Direction of Flow (40 CFR 112.7(b)) ......................12 <br /> 3.5 Containment and Diversionary Structures (40 CFR 112.7(c)) .....................................14 <br /> 3.6 Practicability of Secondary Containment (40 CFR 112.7(d)) .......................................14 <br /> 3.7 Inspections, Tests, and Records (40 CFR 112.7(e)) ...................................................14 <br /> 3.9 Security (40 CFR 112.7(g)).........................................................................................23 <br /> 3.10 Tank Truck Loading/Unloading Rack Requirements (40 CFR 112.7(h))......................23 <br /> 3.11 Brittle Fracture Evaluation (40 CFR 112.7(i)) ..............................................................25 <br /> 3.12 Conformance with State and Local Applicable Requirements (40 CFR 112.70)).........25 <br /> PART 4: DISCHARGE PREVENTION — SPCC Provisions for Onshore Facilities (Excluding <br /> ProductionFacilities).................................................................................................................26 <br /> 4.1 Facility Drainage (40 CFR 112.8(b)) ...........................................................................26 <br /> 4.2 Bulk Storage Containers (40 CFR 112.8(c))................................................................27 <br /> 4.3 Transfer Operations, Pumping, and In-Plant Processes (40 CFR 112.8(d))................32 <br /> SPCC— YRR Lewicki& Associates <br /> Date. YEAR <br />