Laserfiche WebLink
Table 3-2: Inspection and Testing Program <br /> Facility Component Action Frequency/Circumstances <br /> Aboveground Test container integrity by conducting visual Following a regular schedule(monthly,annual, <br /> container with all inspection. Inspect outside of container for and during scheduled inspections)and <br /> sides visible signs of deterioration and discharges. whenever material repairs are made. <br /> Container supports Inspect container's supports and Following a regular schedule(monthly,annual, <br /> and foundation foundations. and during scheduled inspections)and <br /> whenever material repairs are made. <br /> Liquid level sensing Test for proper operation. Monthly <br /> devices(overfill) <br /> Diked area, lined Inspect for signs of deterioration,discharges,Monthly;after large storm events <br /> berms and site berms or accumulation of oil inside diked areas. <br /> Visually inspect content for presence of oil. <br /> Prior to draining <br /> All aboveground Assess general condition of items,such as Monthly <br /> valves, piping,and flange joints,expansion joints,valve glands <br /> appurtenances and bodies,catch pans,pipeline supports, <br /> locking of valves,and metal surfaces. <br /> Buried piping Inspect for deterioration. Whenever a section of buried line is exposed <br /> for any reason. <br /> Integrity and leak testing. At the time of installation, modification, <br /> construction, relocation,or replacement. <br /> Note: If any above ground container is added to the site at a later date, where all sides are not <br /> visible, alternative testing requirements will be needed and the plan will need to be modified. <br /> SPCC— YRR 15 Lcwicki&Associates <br /> Date, YEAR <br />