Laserfiche WebLink
Table 3-1: Potential Discharge Volumes and Direction of Flow <br /> Maximum <br /> volume Maximum <br /> released discharge Direction of <br /> Potential Event (gallons) rate Flow Secondary Containment <br /> Failure of aboveground XX Gradual to TBD Double wall <br /> tank (collapse or instantaneous <br /> puncture below product <br /> level) <br /> Tank overfill 1 to 120 60 gal/min TBD None; Land-based spill <br /> response capability (spill <br /> kit) <br /> Pipe failure 100 50 gal/min TBD None; Land-based spill <br /> response capability (spill <br /> kit) <br /> Leaking pipe or valve 100 1 gal/min TBD None; Land-based spill <br /> packing response capability (spill <br /> kit) <br /> Diesel dispenser hose/ 1 to 150 30 gal/minute TBD None; Land-based spill <br /> connections leak response capability (spill <br /> kit) <br /> Transfer Overflow 1 to 10,000 30 gal/min TBD None, Land-based spill <br /> Failure response capability (spill <br /> kit) <br /> Leak or failure of drum 1 to 55 Gradual to TBD Storage building walls <br /> instantaneous <br /> SPCC— YRR 13 <br /> Date, YEAR Lewicki&Associates <br />