Laserfiche WebLink
1 .4.3 Record of Plan Reviews <br /> Scheduled reviews and Plan amendments are recorded in the Plan Review Log. This log must <br /> be completed even if no amendment is made to the Plan as a result of the review. Unless a <br /> technical or administrative change prompts an earlier review of the Plan, the next scheduled <br /> review of this Plan must occur by Date, YEAR. <br /> 1 .5 Facilities, Procedures, Methods, or Equipment Not Yet Fully <br /> Operational (40 CFR 112.7) <br /> Bulk storage containers at this facility have never been tested for integrity since their installation. <br /> Section 4.2.6 of this Plan describes the inspection program to be implemented by the facility <br /> following a regular schedule, including the dates by which each of the bulk storage containers <br /> must be tested. <br /> 1 .6 Cross-Reference with SPCC Provisions (40 CFR 112.7) <br /> This SPCC Plan does not follow the exact order presented in 40 CFR part 112. Section <br /> headings identify, where appropriate, the relevant section(s) of the SPCC rule. Table 1-2 <br /> presents a cross-reference of Plan sections relative to applicable parts of 40 CFR part 112. <br /> SPCC— YRR 6 Lewicki&Associates <br /> Date, YEAR <br />