Laserfiche WebLink
While Phase 4 is mined and once the appropriate elevations are met, a central and internal <br /> mining access road will be created trending north-south through the middle of the site. The <br /> resultant mining central access final road grade will have an 5% slope. The road corridor will be <br /> constructed—100-foot wide and finished as a gravel surface to remain following final <br /> reclamation(Map F-1). Additional comments detailing a potential CCP realignment are <br /> included on page D-9. <br /> Young Ranch Resource <br /> December 2021 D-15 Lewicki& Associates <br />